Skip to main content
CityRuleLookup

Sedona, AZ Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger threshold
More than 9 parking spaces in new structure
EV-ready share
5% of total spaces, rounded up at midpoint
Common-area space
At least 1 EVCS in shared common-use area
Minimum circuit
40-ampere dedicated branch circuit
Adopted by
Ord. 2019-05, Res. 2019-18, Sept. 24, 2019
Enforcement
Class 1 misdemeanor, up to $2,500 fine

Summary

Sedona requires new commercial and multifamily buildings with more than 9 parking spaces to make 5 percent of those spaces electric-vehicle-ready under Appendix CB of the 2018 International Energy Conservation Code, adopted by the city in 2019. At least one EV-capable space must sit in a common-use area open to every resident, wired for future charging equipment.

CB 101.1 General. These provisions shall be applicable for new construction where electrical vehicle ready provisions are required in Section CB 201.1. CB 201.1 Electrical vehicle ready parking spaces. For every newly permitted structure governed by, and within the scope of, the International Building Code, with more than 9 parking spaces, 5 percent of the total number of parking spaces shall be capable of supporting future electric vehicle charging stations (EVCS) and said spaces shall be identified on the construction documents along with the location of the proposed EVCS. At least one EVCS shall be located in common use areas and available for use by all residents.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Initiative Ordinance 2026-01, approved by voters at the July 21, 2026 election).

Full Breakdown

The City of Sedona adopted the 2018 International Energy Conservation Code by Ordinance 2019-05 and Resolution 2019-18, Exhibit A, on September 24, 2019, and added a new Appendix CB, Electrical Vehicle Ready Parking Areas, that applies to commercial and multifamily construction. 1 triggers whenever a newly permitted structure within the scope of the International Building Code has more than 9 parking spaces: 5 percent of the total spaces, rounded to the nearest whole number with any exact midpoint rounded up, must be built EV-ready, and the location of each future EV charging station has to appear on the construction documents.

At least one of those spaces must sit in a common-use area available to every resident, not reserved to a single unit. The design specifications differ by count. 2 calls for a 208/240-volt individual branch circuit, or a raceway of at least trade size 1 (a nominal 1-inch inside diameter) run from the main service or subpanel to an enclosure near the future charger, with panel capacity reserved for a 40-ampere minimum dedicated circuit. 3 requires the construction documents to show raceway routing, wiring schematics and confirm the electrical system, including any on-site transformer, can simultaneously charge every required EVCS at full rated amperage, planned on a 40-ampere minimum branch circuit.

Any raceway planned for underground, enclosed or concealed installation must go in during original construction. ' All EV supply equipment must meet NFPA 70. 010.

Violations & Fines

Building a covered structure without the required EV-ready spaces, or without the wiring, raceway sizing and 'EV CAPABLE' identification Appendix CB demands, is a violation of Title 15 enforced the same as any other building-code violation: a class 1 misdemeanor under SCC 1.15.010, punishable by a fine up to $2,500, up to six months in jail, or both, with each day of continued noncompliance a separate offense.

Frequently Asked Questions

Does Sedona require me to install an EV charger in my new building?
No. Appendix CB 201.1 only requires the space to be EV-ready: wiring or a raceway sized for a future 40-ampere circuit and marked 'EV CAPABLE.' Installing the actual charging equipment is left to the property owner or tenant, not mandated by the city at construction.
Which buildings does the EV-ready rule apply to?
Any newly permitted structure within the scope of the International Building Code that has more than 9 parking spaces, which in practice means commercial and multifamily projects. Single-family homes and small projects with 9 or fewer spaces fall outside Appendix CB 201.1 entirely.
How many spaces have to be EV-ready?
5 percent of the total parking spaces, rounded to the nearest whole number, with any exact half rounded up. At least one of those EV-ready spaces must be located in a common-use area available to all residents, not assigned to a single unit.
What happens if a builder skips the EV-ready wiring?
It's treated as a Title 15 building-code violation. Under SCC 1.15.010 that is a class 1 misdemeanor carrying a fine of up to $2,500, up to six months in jail, or both, with each day the violation continues counted as a separate offense.

Sources & Official References

Other rules in Sedona

All Sedona rules

Compare Sedona to another location·View the Arizona parking rules overview

Get notified when EV Charging in Sedona, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.