Blaine, MN Property Maintenance: Snow & Sidewalk Clearing (2026)
Key Facts
- Governing section
- City Code § 70-2
- Clearing deadline
- 48 hours after snow stops
- Consequence
- City removal billed to owner
- Late payment charge
- 15% delinquency charge
- Collection method
- Certified to county auditor with taxes
- Possible exemption
- City manager can exempt certain sidewalks
Summary
In the City of Blaine, Minnesota, City Code § 70-2 gives property owners and occupants 48 hours after snow stops falling to clear the public sidewalk in front of or next to their property. If it is not cleared in time, the Public Works Department removes it and bills the owner, adding a 15 percent delinquency charge if the bill goes unpaid.
(1)No owner or occupant of any property, in front of which or adjacent to which, a sidewalk has been constructed for use of the public, shall allow snow to remain upon the sidewalk longer than 48 hours after the snow has ceased to fall thereon. ... (c)Removal by city at property owner's or occupant's expense. Any snow which is not removed in accordance with this section shall be removed by the city at the expense of the owner or occupant of the abutting property. ... (d)Recovery of city's expenses. The cost of removal of snow by the city shall be billed to the property owner. Failure to pay such bill, when due, will result in the costs, plus a delinquency charge of 15 percent, being certified to the county auditor with taxes against the property abutting for collection as other taxes are collected.
Full Breakdown
Section 70-2, "Sidewalk snow removal," places a 48-hour clock on every owner or occupant of property fronting or adjacent to a public sidewalk in the City of Blaine: subsection (b)(1) bars letting snow remain on the sidewalk longer than 48 hours after it stops falling. The city manager can exempt specific sidewalk stretches from that duty under subsection (b)(2) where boulevard size or state and local plowing schedules make compliance difficult for the adjacent owner. If snow is not cleared in time, subsection (c) authorizes the Public Works director to have city crews remove it at the owner's or occupant's expense, keeping a record of the cost and time of the work performed.
Subsection (d) then bills that cost to the property owner, and if the bill is not paid when due, adds a 15 percent delinquency charge and certifies the total to the county auditor to be collected with the property's taxes the same as any other special assessment. Subsection (e) protects the city from any claim arising out of an owner's failure to comply. The rule sits in Chapter 70, "Streets, Sidewalks, Special Events," alongside the separate street-obstruction ban in section 70-3 that also reaches snow plowed or blown back onto a public street.
Violations & Fines
Missing the 48-hour window in section 70-2(b)(1) does not bring a criminal charge; instead, subsection (c) lets the city clear the sidewalk itself and bill the owner or occupant for the cost under subsection (d). An unpaid bill draws a 15 percent delinquency charge and is certified to the Anoka or Ramsey County auditor for collection with the property's taxes.
Frequently Asked Questions
How long do I have to shovel my sidewalk in Blaine?
What happens if I don't clear my sidewalk in time in Blaine?
Can Blaine sue me if someone slips on my uncleared sidewalk?
Sources & Official References
Other rules in Blaine
Compare Blaine to another location·View the Minnesota property maintenance overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.