Key Facts

Governing section
Montebello Municipal Code § 8.40.030
Lots under 1 acre
full groundcover or ten-foot planter
Lots 1 acre+
perimeter planter plus security fence
Fence height
6 ft standard, up to 8 ft with director approval
Dead vegetation/irrigation fix window
72 hours
Graffiti removal window
24 hours

Summary

Every unimproved vacant lot in Montebello, whether it was never built on or cleared after demolition, needs a planning-division-approved landscape and irrigation plan. Lots under an acre must be covered in sod, hydro-seed or drought-tolerant groundcover; lots an acre or larger need a ten-foot perimeter planter, working irrigation, and a security fence up to eight feet high.

Lots that are unimproved due to never having been developed or having become vacant subsequent to the removal of any pre-existing buildings, structures or impervious surfaces shall be subject to the approval of a landscape and irrigation plan by the planning division and shall be improved and maintained at all times in accordance with the following provisions: A.Lots Less Than One Acre. For unimproved vacant lots that are less than one acre in size, the entire lot shall be improved and maintained in the following manner:1.For residentially zoned lots, the entire lot shall be maintained using sod, hydro-seed, drought tolerant ground cover or other acceptable ground cover approved by the planning division. The ground cover shall be maintained in good condition at all times. ... 4.The lot shall be maintained free of litter and debris, including the stockpiling of any material at all times. ... B.Lots One Acre or Greater. ... 4.A six-foot high decorative, view-obscuring fence shall be installed behind all required perimeter landscaping to secure the lot.

Full Breakdown

Section 8.40.030 of the Montebello Municipal Code requires every unimproved vacant lot, whether it was never developed or became vacant after existing buildings or pavement were removed, to be improved and maintained under a landscape and irrigation plan approved by the planning division. For lots under one acre, residentially zoned parcels must be covered entirely in sod, hydro-seed, drought-tolerant groundcover or other planning-division-approved cover kept in good condition, while commercially or industrially zoned lots need a minimum ten-foot-wide landscaped planter along every street frontage; either way, the lot needs a working irrigation system, must stay free of litter, debris and stockpiled material, and any dead vegetation or broken irrigation must be replaced within seventy-two hours of discovery.

Lots one acre or larger carry heavier obligations: a ten-foot perimeter planter with trees, shrubs and groundcover under an approved irrigation plan, and a six-foot decorative, view-obscuring security fence installed behind the landscaping, which the planning and community development director can require up to eight feet high where the site's topography calls for it; the fence needs a security gate with a code kept current with the police department. The owner must post contact information for the property owner or manager at the site, and remove any graffiti on the fencing within twenty-four hours.

Violations & Fines

Failing to maintain a vacant lot under Section 8.40.030, whether by letting groundcover die, litter accumulate, irrigation break down or graffiti sit unremoved, is enforced through the chapter's cumulative remedies under Sections 1.12 and 1.14 of the Montebello Municipal Code, which authorize misdemeanor prosecution, administrative citations and civil penalties, in addition to any monitoring fees assessed against the property under Section 8.40.100.

Frequently Asked Questions

Do I need a permit to landscape a vacant lot in Montebello?
Yes. Section 8.40.030 requires the planning division to approve a landscape and irrigation plan before an unimproved vacant lot can be improved, whether the lot was never built on or became vacant after a demolition.
How tall can the fence be around my vacant lot?
A six-foot decorative, view-obscuring fence is standard for lots an acre or larger, but the planning and community development director can approve up to eight feet where the lot's topography or security needs justify it, under Section 8.40.030(B)(4).
How fast do I need to fix dead landscaping or a broken sprinkler?
Within seventy-two hours of discovering it, under Section 8.40.030. The same lot must also be inspected weekly by the owner for litter, debris and irrigation problems.

Sources & Official References

Other rules in Montebello

All Montebello rules

California rules heatmap·Compare Montebello to another location·View the California property maintenance overview

Get notified when Vacant Lot Maintenance in Montebello, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Vacant Lot Maintenance in Nearby Cities

How other cities in Los Angeles County handle vacant lot maintenance.

Norwalk, CA
Some Restrictions
Compton, CA
Some Restrictions
Carson, CA
Some Restrictions
Pasadena, CA
Some Restrictions
Palmdale, CA
Some Restrictions
Pomona, CA
Some Restrictions
Glendale, CA
Some Restrictions
Lakewood, CA
Some Restrictions