Amherst, NY Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permitting authority
- Town Superintendent of Highways
- Max driveways per lot
- 4 total, 2 per frontage
- Curb lowering limit
- 30 ft single, 24 ft multiple
- Corner clearance
- 6 feet from corner
- Advance notice required
- 24 hours before apron work
Summary
Anyone building a driveway or recessed parking area across a curb, sidewalk or shoulder on a Town highway in Amherst must first get a curb cut permit from the Town Superintendent of Highways. The permit application requires a plot plan and must meet detailed placement standards before work starts.
Any person desiring to construct a driveway approach or recessed parking area across any curbing, sidewalk or shoulder on a Town highway shall first make application for a permit to the Town Superintendent of Highways. The application shall be in writing upon a form to be provided for the Superintendent of Highways for that purpose and available at the office of the Superintendent.
Full Breakdown
Amherst's Curb Cut Procedures and Standards Act, Chapter 95 of the Town Code, governs any private encroachment into the highway right-of-way to build vehicle access. Section 95-3 requires a written application to the Superintendent of Highways showing the estimated cost of construction, the section, lot and block number, and a plot plan with the proposed driveway's location and dimensions, filed by the property owner or an authorized agent. Section 95-4 then sets the technical standards the Superintendent applies before issuing the permit: no more than four driveways per lot and no more than two on a single frontage, a maximum curb-lowering of 30 feet for a single driveway or 24 feet per driveway where there are multiples, at least 20 feet of full curb between driveways on the same lot, and no curb lowered within six feet of a corner.
Ramp grade to the sidewalk needs the Superintendent's approval and generally cannot exceed one-quarter of the sidewalk width where there is no park strip. Applicants must notify the Superintendent at least 24 hours before installing a driveway apron in the right-of-way, and any damage to Town property during construction must be repaired within 24 hours at the applicant's expense. Section 95-2 grounds the whole chapter in Town Law § 130(7)(a) and Highway Law § 213, which give the Town authority to regulate driveway construction on Town highways.
Violations & Fines
Failing to comply with the curb cut standards is a violation of Chapter 95, and the Town Highway Superintendent may revoke the curb cut permit under § 95-4(P) if the applicant or its agents do not meet the permit's conditions. The applicant also remains liable for repairing any damage to the right-of-way within 24 hours and must hold the Town harmless for damages arising from the authorized work.
Frequently Asked Questions
Do I need a permit to install a new driveway in Amherst?
How close to a corner can my driveway curb cut be?
Can the Town revoke my curb cut permit?
Sources & Official References
Other rules in Amherst
New York rules heatmap·Compare Amherst to another location·View the New York sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in Erie County handle encroachment permits.