Blaine, MN Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing sections
Blaine City Code Sections 70-65, 70-70
Permit types
Excavation, obstruction, small wireless facility permits
Short obstruction exception
8 hours or less for repairs
Unpermitted work penalty
Double permit fee and double other fees
Registration required first
Section 70-65 before any right-of-way work

Summary

In the City of Blaine, Minnesota, no one may obstruct or excavate a public right-of-way, including for private encroachments like driveways or utility work, without first obtaining an excavation or obstruction permit from the city under Blaine City Code Section 70-70, and anyone occupying the right-of-way must first register with the city under Section 70-65.

(a)Permit required. Except as otherwise provided in this Code, no person may obstruct or excavate any right-of-way without first having obtained the appropriate right-of-way permit from the city to do so.(1)Excavation permit. An excavation permit is required by a registrant to excavate that part of the right-of-way described in such permit or to hinder free and open passage over the specified portion of the right-of-way by placing facilities described therein, to the extent and for the duration specified therein. ... (2)Obstruction permit.a.An obstruction permit is required by a registrant to hinder free and open passage over the specified portion of right-of-way by placing equipment, facilities, vehicles or other obstructions described therein on the right-of-way, to the extent and for the duration specified therein.

Full Breakdown

Blaine City Code Section 70-70 requires a right-of-way permit before anyone obstructs or excavates a public right-of-way. An excavation permit covers digging or placing facilities that hinder passage over the right-of-way; an obstruction permit covers placing equipment, facilities, vehicles, or other obstructions, though an obstruction of eight hours or less for repairing existing facilities does not need one. Before any permit application, Section 70-65 requires anyone who occupies or places equipment in the right-of-way, including private contractors doing sewer, water, or driveway work, to register with the city and pay a registration fee; certain minor activities are exempted, such as boulevard plantings, non-vegetative landscaping 12 inches or less in height, mailbox posts no larger than four inches by four inches, and private irrigation or pet containment systems, though a separate work-in-right-of-way permit under Section 70-1 can still apply to driveway or utility work.

Section 70-70(a)(4) additionally requires a special or conditional use permit to install a new wireless support structure in a right-of-way zoned single-family residential or within a historic district. Permits can be revoked under Section 70-84 for a substantial breach, such as violating a material permit condition or failing to complete work on time, and the city may impose a delay penalty under Section 70-70(c) for unreasonable delays in excavation, obstruction, patching, or restoration, following Minn. R. 7819.1000. Anyone who obstructs or excavates without first getting the required permit, outside an emergency, must still obtain one afterward and, as a penalty, pay double the normal permit fee and double all other required fees under Section 70-82(b).

Violations & Fines

Obstructing or excavating the right-of-way without the permit required by Section 70-70, outside an emergency, means the responsible party must still get a permit afterward and pay double the normal permit fee, double all other city fees, and deposit funds to cover any damage, under Section 70-82(b). The city can also revoke a permit outright for a substantial breach of its conditions under Section 70-84, without refunding the permit fee.

Frequently Asked Questions

Do I need a permit to put a driveway or utility line in the Blaine right-of-way?
Yes. Blaine City Code Section 70-70 requires an excavation or obstruction permit before anyone obstructs or excavates the right-of-way, and Section 70-65 requires registering with the city first. A separate work-in-right-of-way permit under Section 70-1 covers routine driveway, sidewalk, and utility service work approved by the city engineer.
What happens if I dig in the Blaine right-of-way without a permit?
Outside an emergency, Section 70-82(b) requires you to obtain a permit after the fact and pay double the normal permit fee plus double all other required fees, along with a deposit to cover any right-of-way damage.
Can Blaine revoke a right-of-way permit?
Yes. Section 70-84 allows the city to revoke a permit without refunding the fee for a substantial breach, such as violating a material permit condition, misrepresenting facts in the application, or failing to complete the work on time without an approved extension.

Sources & Official References

Other rules in Blaine

All Blaine rules

Compare Blaine to another location·View the Minnesota sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Blaine, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.