Dade City, FL Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issuer
city public works department
Base permit fee
$20.00, § 78-153
Street-cut fee
+$50.00 each
Permit validity
120 days, max 1 year
Road-closing notice
3 business days

Summary

Dade City Code § 78-1 bars building over or on a public street or sidewalk without authorization, and § 78-151 requires a public works department permit before installing poles, jack-and-bore lines, or any aboveground improvement in a city right-of-way or easement.

It shall be unlawful for any person to erect, maintain or permit to be erected or maintained any building, structure, fence, wall or other encroachment or part thereof, on or above any part of any public street, sidewalk or other public property except marquees, awnings, signs and other facilities authorized by the city. ... (a)A permit shall be obtained from the public works department prior to installing, placing, constructing or replacing as described in this article, any improvement within any right-of-way or easement, including but not limited to the following: all jack and bores regardless of bore method used; all poles, regardless of design use; all aboveground improvements that create an obstruction. All security lights and streetlights shall require a permit but shall be exempt from the right-of-way and easement use permit fee.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 18 | Land Development Regulations: Supplement 1).

Full Breakdown

Dade City Code of Ordinances § 78-1 makes it unlawful to erect or maintain any building, structure, fence, wall, or other encroachment on or above a public street, sidewalk, or other public property, unless the item is a marquee, awning, sign, or other facility the city has authorized. For work within a right-of-way or easement, § 78-151(a) requires a permit from the public works department before installing, placing, constructing, or replacing an improvement there, including jack-and-bore work, poles of any design, and aboveground improvements that create an obstruction; security lights and streetlights need the permit but are exempt from the permit fee.

Section 78-151(b) exempts driveways, work confined to utility easements, and small franchise-utility work meeting a list of conditions, such as disturbing no more than 100 square feet, going no deeper than 48 inches, and leaving the site restored to its prior condition. Section 78-152 sets the mechanics: the applicant must be the owner or responsible party, not a subcontractor, a permit runs 120 days from issuance and can be extended but never exceeds one year total, and the permittee must give the city at least two business days' notice before construction starts, plus a maintenance-of-traffic plan and three business days' notice for any road closing.

00 more for any project that requires an as-built survey under § 78-155. Section 78-154 requires a duplicate set of design plans, no larger than 8½ by 14 inches, showing materials, pipe or conduit sizes, cross-sections, and every other right-of-way user who might be affected, so utilities sharing the easement can weigh in before work begins.

Violations & Fines

Building an unauthorized structure over a public street or sidewalk violates § 78-1, and starting right-of-way work without the public works department permit required by § 78-151 is a separate violation. Chapter 78 carries no dedicated fine, so both are punished under the citywide general penalty at § 1-7: up to $500.00, up to 90 days in jail, or both, with each day of unpermitted work a separate offense.

Frequently Asked Questions

Do I need a permit to put something in the Dade City right-of-way?
Yes, in most cases. Section 78-151 requires a public works department permit before installing, placing, or replacing an improvement in a city right-of-way or easement, covering things like poles, jack-and-bore lines, and any aboveground improvement that creates an obstruction.
What work is exempt from the right-of-way permit?
Section 78-151(b) exempts driveways and work confined entirely within a utility easement, plus small franchise-utility work that won't disturb paved areas, won't exceed 100 square feet, stays above 48 inches deep, and gets restored to its prior condition.
How much does a right-of-way permit cost in Dade City?
Section 78-153 sets a $20.00 base permit fee, plus $50.00 for each street cut, and an additional $100.00 if the project requires an as-built survey under § 78-155.
How long is a right-of-way permit good for?
Section 78-152 gives a permit a base term of 120 days from issuance, which the city can extend if the project needs more time, but no permit runs longer than one year from the date it was issued.

Sources & Official References

Other rules in Dade City

All Dade City rules

Florida rules heatmap·Compare Dade City to another location·View the Florida sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Dade City, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Encroachment Permits in Nearby Cities

How other cities in Pasco County handle encroachment permits.

New Port Richey, FL
Some Restrictions