Hall County, GA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Public utility permit fee
- $10.00
- Public utility permit authority
- Hall County Engineer
- Private utility permit authority
- Board of Commissioners
- Private permit expiration
- Void if not built within 90 days
- Maximum penalty
- $1,000 fine or 6 months, or both
Summary
Installing utility lines in a Hall County road right-of-way outside any municipality requires a written permit. Public utilities apply to the county engineer for a $10.00 permit under § 12.50.030; private utilities need written permission from the board of commissioners itself under § 12.50.100, and their permits expire if construction is not finished within 90 days.
Before installing any utility facilities, a private utility shall be required to apply for and obtain written permission from the board of commissioners of the county. The application shall be sent to the county in writing addressed to the county engineer, who shall review the application and present it to the board of commissioners. The application must include the following: A. Name and address of the applicant; B. Name and address of the contractor, if any; C. Name of the road and general location of the same; D. A schematic drawing of the construction plans of the utility facility must be attached; E. A plat or map showing the location of the utility facility in relation to the existing roadway, pavement, or curb must be attached; and F. Date construction or installation is scheduled to begin.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 80).
Full Breakdown
Chapter 12.50, Utility Franchises and Easements, grants public utilities a nonexclusive right to construct and maintain facilities in county road rights-of-way outside incorporated municipalities, excluding federal-aid primary routes, numbered state routes, and certain state highway authority projects, under § 12.50.020. Before installing, a public utility must apply in writing to the county engineer, pay a $10.00 fee, and submit the applicant's and contractor's names and addresses, the road and location, a schematic of the construction, a plat showing the facility relative to the roadway, and the start date, under § 12.50.030.
If the county administrator disapproves the application, the applicant may confer with the administrator and, if still disapproved, appeal to the board of commissioners, which may direct that a permit issue regardless of any other provision if it finds that in the county's and citizens' best interest (§ 12.50.040). Private utilities face a stricter path: § 12.50.090 grants the same nonexclusive right-of-way privilege, but § 12.50.100 requires the applicant to obtain written permission directly from the board of commissioners, routed through the county engineer, with the same application details.
A private utility permit expires and becomes void if construction is not completed within 90 days of issuance (§ 12.50.110), and the private utility must post a bond or escrow account, in an amount the board sets, to assure proper construction and maintenance before the permit issues (§ 12.50.150), plus indemnify the county against claims arising from the work (§ 12.50.170).
Violations & Fines
Violating chapter 12.50 lets the county stop work, order removal of the underground line, and require the roadway restored to its original condition, and it is separately a misdemeanor under § 12.50.230, punished per § 1.50.020 with up to a $1,000.00 fine or six months' imprisonment, or both. Section 12.50.240 additionally lets the county pursue injunction, mandamus, or other action to correct or abate the violation.
Frequently Asked Questions
Who approves a utility line permit in unincorporated Hall County?
How much does a right-of-way utility permit cost?
How long is a private utility right-of-way permit valid?
Does a private utility have to post a bond?
Sources & Official References
Other rules in Hall County
Compare Hall County to another location·View the Georgia sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.