Howell, NJ Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit issuer
Township Community Development Director or authorized agent
Permit fee
$85 for one eruv system
Minimum height over a vehicle roadway
20 feet, unless the Township agrees otherwise
Utility-pole-only systems
Permitted as of right with the utility's written permission
Maximum fine
$1,000 for each violation
Cure period for unsafe condition
Seven days after notice

Summary

In Howell Township, New Jersey, nobody can install, construct or modify an eruv in a public right-of-way or across a public road without a permit from the Township Community Development Director or an authorized agent. The permit fee is $85 for one eruv system, and a violation carries a fine of up to $1,000.

B. Permit required. ... (1) It shall be unlawful to install, construct or modify, or cause to be installed, constructed or modified, an eruv, or any part thereof, within public rights-of-way and across all public roads within the right-of-way, and across all other public and private property where agreed to and permitted via easement or other legal agreement without first obtaining a permit from the Township Community Development Director or authorized agent. ... (7) Permit fee. The applicant shall submit a permit fee of $85 for a standard eruv permit application. The $85 permit shall be for one eruv system. ... (1) Violations and penalties. Any person violating any of the provisions of this section shall, upon conviction thereof, be subject to a fine not exceeding $1,000 for each violation.

Full Breakdown

Howell Township Code § 188-17.1, added 5-6-2025 by Ord. No. 25-20, makes it unlawful to install, construct or modify an eruv, or any part of one, within public rights-of-way, across public roads, or across other public and private property where an easement or other legal agreement allows it, until the permit is in hand. The permit comes from the Township Community Development Director or an authorized agent. One carve-out exists: an eruv system maintained solely on utility poles is permitted as of right and needs no separate Township permit, provided the installer has prior written permission from the utility company.

The application goes to the Township Department of Community Development. It must carry the applicant's name and address, a sketch diagram of the entire system showing the height and location of every pole by street and block and lot number, and the precise location of anything on or across public property or right-of-way. If the eruv crosses or sits on private property, written permission from those owners is part of the application. The applicant also supplies proof of liability insurance with a certificate naming the Township as an additional insured, signs an indemnification agreement acceptable to the Township, and shows proof that utilities are marked out through New Jersey's Call Before You Dig service. The fee is $85 for one eruv system, and an application that spans more than one system, in the Township's description, can require an additional permit for each. An applicant who meets the criteria and pays the fee is issued the permit.

Subsection C sets the physical limits for anything that sits in the right-of-way. Any horizontal member must be at least 10 feet high, or at least 20 feet high across a street or public right-of-way where vehicles travel, unless the Township agrees otherwise. Where existing poles are not available, new poles cannot exceed 20 feet unless the Township agrees otherwise, and new poles are silver or white galvanized metal. Township road opening permits under Chapter 277 are required only if the work will disrupt, excavate or otherwise disturb the paved roadway, curbing or sidewalk.

Violations & Fines

Under § 188-17.1E(1), anyone who violates the section is, upon conviction, subject to a fine not exceeding $1,000 for each violation. Under E(2), the Township can revoke an issued permit if the applicant does not follow the permit terms or the section. An unsafe or hazardous eruv must be corrected within seven days after notice; if it poses an immediate safety threat, the Township makes expedited repairs and the responsible person pays the cost.

Frequently Asked Questions

Do I need a permit to attach an eruv to utility poles in Howell Township?
No separate Township permit is needed when the eruv system is maintained solely on utility poles. Section 188-17.1B(2) permits that as of right, but the person installing it must first obtain prior written permission from the utility company that owns the poles.
What does the Howell Township eruv permit application require?
Section 188-17.1D requires the applicant's name and address, a sketch diagram of the whole system with pole locations by block and lot, proof of liability insurance naming the Township as additional insured, an indemnification agreement, proof of a Call Before You Dig utility mark-out, and the $85 fee.
Is a road opening permit also required for an eruv in Howell Township?
Only when the work will disrupt, excavate or otherwise disturb the paved roadway, curbing or sidewalk. In that case a Township road opening permit under Chapter 277 applies, and state or county road opening permits must be obtained where those agencies require them.

Sources & Official References

Other rules in Howell

All Howell rules

Compare Howell to another location·View the New Jersey sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Howell, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Encroachment Permits in Nearby Cities

How other cities in this county handle encroachment permits.

Long Branch, NJ
Some Restrictions