Key Facts

Permit authority
Street Commissioner
Application fee
$25.00 to the City Clerk
Max time excavation open
36 hours
Performance bond
$500 to $10,000, by linear feet
Penalty for violation
up to $100 per day

Summary

In the City of La Grange, City Code § 575.010 bars disturbing or digging in any street, alley, sidewalk or drainage ditch without first getting the Street Commissioner's written permission. Section 575.020 requires a written application to the City Clerk and a $25 fee before any excavation into a street, alley or right-of-way begins.

No person, firm or corporation shall disturb, mar or in anyway break the surface of or dig in any street, alley, sidewalk, drainage ditch or other property belonging to the City of LaGrange, Missouri, without having first submitted an application in writing specifying the place and purpose of disturbing any such surface and without having first obtained the express written permission of the Street Commissioner of the City of LaGrange, Missouri. ... All applications for any excavations into any street, alley or public right-of-way within the City of LaGrange shall be made in writing to the City Clerk and the applicant shall pay a fee of twenty-five dollars ($25.00).

Full Breakdown

Chapter 575, Excavations, opens with a blanket prohibition in Section 575.010: no person, firm or corporation may disturb, mar or break the surface of, or dig in, any street, alley, sidewalk, drainage ditch or other City-owned property without first submitting a written application specifying the place and purpose and obtaining the Street Commissioner's express written permission. Section 575.020 turns that into a concrete process, requiring the application in writing to the City Clerk along with a $25.00 fee before any excavation into a street, alley or public right-of-way.

Once the Street Commissioner issues a permit, Section 575.030 requires the applicant to do the digging under the Commissioner's supervision and keep the excavation to the minimum size the purpose requires. Section 575.040 caps how long a cut may stay open: it must be backfilled as soon as practicable and, in no event, remain open longer than 36 hours. While it is open, Section 575.050 requires barricades and warning flares at all times, and Section 575.060 bars completely blocking a street, requiring at least one lane of through traffic at all times.

Section 575.070 sets the backfill material itself, sand topped with at least eight inches of white rock fill where the hard-top surface was destroyed, with the City doing the surface restoration and the applicant paying for it. If the applicant does not properly restore the site, Section 575.090 lets the Street Commissioner make the repairs and bill the excavating party a reasonable fee. For larger facilities work, Section 575.100 requires a performance bond scaled to the length of the cut: $500 under 20 linear feet, $5,000 for 20 to 100 feet, and $10,000 beyond that, or a $50,000 blanket bond for ongoing permit holders.

Violations & Fines

Digging into a City street, alley, sidewalk or right-of-way without the Street Commissioner's written permission and an approved application violates Section 575.010. Section 575.100(C) sets a specific penalty for facilities work done under this Article: up to $100 per day for as long as the violation continues, on top of the applicant's liability for the City's cost of repair and any performance-bond forfeiture.

Frequently Asked Questions

Do I need a permit to dig up the street or sidewalk in front of my house in La Grange?
Yes. Section 575.010 prohibits disturbing or digging in any street, alley, sidewalk or drainage ditch without first getting the Street Commissioner's written permission, and Section 575.020 requires a written application and a $25.00 fee before work starts.
How long can I leave an excavation open in a City street?
Section 575.040 requires backfilling as soon as practicable and sets an absolute limit of 36 hours; the excavation may not remain open longer than that regardless of the project's size.
What safety measures does the City require around an open excavation?
Section 575.050 requires the excavation to be surrounded with barricades and warning flares at all times it stays open, and Section 575.060 requires at least one lane of street traffic to remain passable throughout the work.
Is a bond required for right-of-way excavation work?
Yes, for facilities work. Section 575.100 scales the performance bond to the length of the cut: $500 for under 20 linear feet, $5,000 for 20 to 100 feet, and $10,000 beyond that, or a $50,000 blanket bond for repeat permit holders.

Sources & Official References

Other rules in La Grange

All La Grange rules

Compare La Grange to another location·View the Missouri sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in La Grange, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.