Rothschild, WI Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit required
- before placing facilities in any Village right-of-way
- Fee
- set by the Village Board fee schedule
- Relocation order deadline
- at least 72 hours
- Digger's Hotline
- mandatory under Wis. Stat. § 182.0175
- Abandoned facilities
- declared a nuisance after 1 year unused
- Discontinued-use removal deadline
- 2 years
- General penalty
- § 1-2, $10-$500 forfeiture
Summary
Placing poles, wires, pipes, conduits or other equipment in a Rothschild street, sidewalk or other public right-of-way requires a Village permit under Code § 184-1. Owners apply on Village forms, pay a fee set by the Village Board, and must relocate facilities at their own expense whenever the Village orders it for health, safety or public-improvement reasons.
A. Pursuant to its authority under Wis. Stat. §§ 66.0425, 86.07, 86.16, 182.017, and 196.58, the Village hereby enacts this Chapter for reasonable regulations on the placement and maintenance of facilities currently within its rights-of-way or to be placed therein in the future. ... C. Location of facilities. (1) A Village permit is required prior to the placement of facilities within rights-of-way.
Full Breakdown
Chapter 184, adopted in 2019 under the Village's authority over streets, highways and utility facilities in Wis. 58, governs any 'facilities' - poles, wires, pipes, cables, conduits, ducts, manholes, vaults and similar equipment - placed within a Village right-of-way, a term the chapter defines to include the surface and space above and below streets, highways, terraces, shoulders, side slopes and public sidewalks. Before placing facilities, an owner must obtain a Village permit, apply on Village forms, and pay the fee set in the Village's fee schedule; the permit can cover installation, maintenance, site cleanup and right-of-way restoration, and an owner accepting it agrees to indemnify the Village against claims arising from the facilities.
The Village may limit or prohibit new facilities based on public need, right-of-way condition, timing and existing infrastructure, and can assign specific corridors that later-installed facilities must relocate into at the next reconstruction or excavation. Owners connecting to a Village bridge must submit an engineer's structural analysis and give up any claim to compensation if the bridge is later repaired or replaced. All right-of-way users must comply with Digger's Hotline location requirements under Wis. 0175, and an owner who fails to locate facilities within 10 days of a Village request, repeatedly within a 12- or 24-month window, risks losing the privilege to keep facilities in the right-of-way or being required to post security.
Violations & Fines
Violating Chapter 184 or a permit condition is punished under the Village's general penalty, § 1-2: a forfeiture of $10 to $100 for a first offense and $50 to $500 for a repeat within a year, plus prosecution costs and up to six months in jail if unpaid. Owners who repeatedly fail to locate facilities within 10 days of a request, more than once in 12 months, can lose the right-of-way privilege or must post a bond.
Frequently Asked Questions
Do I need a permit to put utility lines in a Rothschild street or sidewalk?
Can the Village make me move my equipment already in the right-of-way?
What happens to abandoned equipment left in the right-of-way?
What if I don't call Digger's Hotline before digging near right-of-way facilities?
Sources & Official References
Other rules in Rothschild
Compare Rothschild to another location·View the Wisconsin sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in Marathon County handle encroachment permits.