Sedona, AZ Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit classes
4: general, project, consent, citywide
Enforcing official
City Engineer
Project permit term
60 days from issuance
Insurance trigger
costs over $1,500
Insurance minimum
$1M per occurrence, $2M aggregate
After-the-fact fee
3x standard permit fee
Max penalty
$2,500 fine / 6 months jail

Summary

Anyone building, installing or maintaining something in a Sedona public right-of-way, from a driveway apron to a utility line, needs one of four permits from the city engineer before starting work. General, project, city-developed consent and citywide permits each cover a different scope, and work done before a permit is issued gets billed at triple the standard fee.

A. Compliance. No person, organization, public service utility or franchise grantee shall be issued a permit for construction and maintenance upon, over, along, across and under present and future public rights-of-way without first having complied with subsection (B), (C) or (D) of this section, as applicable. B. Classes of Permit. There shall be four classes of permit: •General permit. •Project permit. •City-developed consent permit. •Citywide permit. ... ... A. Permit Fees. At the issuance of a permit, the city engineer shall collect the permit fees set forth in the city consolidated fee schedule as adopted by the city council from time to time. Such fees shall be paid in lawful money of the United States or by collectible draft, check, credit card or debit card. Should such fee payment instrument be uncollectible within 15 days, the permit shall be null and void. The fee for permits applied for after the fact shall be three times the project permit fee in the consolidated fee schedule.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Initiative Ordinance 2026-01, approved by voters at the July 21, 2026 election).

Full Breakdown

020 extends the chapter to streets, drainage ways, roads, alleys, sidewalks, bridges and public places. 070 creates four permit classes: a general permit for utilities with franchise agreements doing repetitive work such as above-ground appurtenances or buried service lines; a project permit for construction not covered by a general permit; a city-developed consent permit; and a citywide permit letting a property owner do work adjacent to their own residence. 070(C)(3)(e). 100 has the city engineer collect fees from the city's consolidated fee schedule, and a permit applied for after the fact, meaning after work already started, costs three times the standard project permit fee. 080, extendable by the city engineer, with work running past 180 days billed additional fees for each further 60-day increment. 060.

Violations & Fines

If the city engineer declares work deficient, the permittee has 15 days to fix it under SCC 12.05.070(C)(11); if not corrected in time, the city engineer corrects the deficiency directly and collects the full cost from the permittee. Beyond that, SCC 1.15.010 makes any city code violation a class 1 misdemeanor punishable by a fine up to $2,500, up to six months in jail, or both, with each day of a continuing violation a separate offense, and a peace officer or code enforcement officer can issue a civil citation instead.

Frequently Asked Questions

Do I need a permit to dig or build in Sedona's right-of-way?
Yes. SCC 12.05.070 says no person, utility or franchise grantee may be issued a permit for construction or maintenance in a public right-of-way without complying with the chapter's permit classes first, and SCC 12.05.160 makes unpermitted encroachment on the right-of-way unlawful. The city engineer issues general, project, city-developed consent or citywide permits depending on the work.
What happens if I do the work before getting a permit?
Under SCC 12.05.100, an after-the-fact permit costs three times the standard project permit fee, and the application form itself includes a checkbox for an 'After the Fact Permit Request.' The city engineer can still deny it if the completed work impaired the right-of-way's integrity or public safety.
How long does a right-of-way permit last?
A project permit is valid for 60 days from issuance under SCC 12.05.080, though the city engineer can grant more time if a project needs it; work extending past 180 days is billed additional fees for each 60-day extension. A general permit lasts up to one year and a citywide permit runs until revised or revoked.
What if a contractor doesn't fix a problem the city engineer flags?
SCC 12.05.070(C)(11) gives the permittee 15 days to correct work the city engineer has declared deficient. If it isn't fixed in that window, the city engineer proceeds to correct the deficiency directly and collects all costs from the permittee, on top of any penalty under SCC 1.15.010.

Sources & Official References

Other rules in Sedona

All Sedona rules

Compare Sedona to another location·View the Arizona sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Sedona, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.