Blaine, MN Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit
Building permit required before erection
Placement
Rear yard only
Side setback
20 feet
Rear setback
30 feet
Max height (full tilt)
15 feet
Footprint cap
3,000 sq ft (FR) / 2,000 sq ft (RE)
Penalty
Misdemeanor, up to $1,000 fine, 90 days

Summary

In the City of Blaine, a ground-mounted solar array is an accessory structure: no one may erect one without a building permit under Sec. 101-7(b)(1), and in the Farm Residential and Residential Estate zones it must sit in the rear yard with a 20-foot side setback, 30-foot rear setback, 15-foot maximum tilt height and a footprint cap of 3,000 or 2,000 square feet.

No person shall erect, alter, remodel, wreck or move any kind of a structure or building or part thereof without first securing a building permit. ... (6)Ground-mounted solar systems meeting standards outlined in 109-54(25). ... (25)Standards and requirements for ground mounted solar systems:a.Rear yard only.b.Side yard setback: 20 feet.c.Rear yard setback: 30 feet.d.The maximum height at full tilt is 15 feet.e.The footprint of the solar panel units and any attached and/or detached accessory structures may not total more than 3,000 square feet.f.Solar collection devices shall be designed and located to avoid solar glare or reflection onto adjacent properties and right of way and shall not interfere with traffic or create a safety hazard.

Full Breakdown

Before installing solar panels, the City of Blaine requires a building permit: Sec. 101-7(b)(1) states no person shall erect, alter, remodel, wreck or move any kind of a structure without first securing one. The zoning administrator (director of community development) reviews the site plan for conformity with the development code before the building official issues the permit, per Sec. 101-7(c). A ground-mounted solar system is listed as an accessory use in the Farm Residential (FR) district under Sec. 109-52(6) and the Residential Estate (RE) district under Sec.

109-84(7), each cross-referencing its own numeric standards. Under Sec. 109-54(25) (FR) and the parallel Sec. 109-86(21) (RE), the array must sit in the rear yard only, keep a 20-foot side yard setback and a 30-foot rear yard setback, and reach no more than 15 feet in height at full tilt. Its footprint, combined with any other attached or detached accessory structures on the lot, cannot exceed 3,000 square feet in the FR district or 2,000 square feet in the RE district. The code also requires the panels be designed and located to avoid solar glare or reflection onto neighboring properties and the right-of-way, and it puts the burden on the property owner to orient reflection angles away from neighbors' windows, with buffering required where necessary.

Outside the low-density residential zones, ground-mounted solar is instead listed as an accessory use subject to conditional use permit review in the Planned Office/Industrial, General Business, and I-1/I-2 industrial districts, meaning the planning commission and city council weigh it case by case rather than under a fixed setback table.

Violations & Fines

Installing a structure, including a ground-mounted solar array, without first obtaining a building permit violates Sec. 101-7(b)(1). Any violation of the zoning subpart's conditions or standards, including the solar setback, height or footprint limits, is a misdemeanor under Sec. 101-7(d)(1), punishable by a fine of up to $1,000, imprisonment of up to 90 days, or both, plus the cost of prosecution. The zoning administrator may also order construction halted or require an after-the-fact permit application.

Frequently Asked Questions

Does the City of Blaine require a permit for a ground-mounted solar array?
Yes. Sec. 101-7(b)(1) of the Blaine City Code bars anyone from erecting any structure, including a ground-mounted solar system, without first securing a building permit from the building official, who issues it only after the zoning administrator confirms the site plan meets the development code.
Where can I place a ground-mounted solar system on my Blaine lot?
In the Farm Residential and Residential Estate districts, Secs. 109-54(25) and 109-86(21) confine a ground-mounted solar array to the rear yard only, keeping it 20 feet back from the side lot line and 30 feet back from the rear lot line before it can be installed.
How tall and how large can a Blaine solar array be?
The array cannot exceed 15 feet in height at full tilt, and its footprint, combined with other accessory structures, is capped at 3,000 square feet in the Farm Residential district or 2,000 square feet in the Residential Estate district under Sec. 109-54(25)/109-86(21).
What happens if my solar installation does not meet Blaine's standards?
Failing to meet the setback, height or footprint standards, or building without a permit, is a misdemeanor under Sec. 101-7(d)(1), carrying a fine of up to $1,000, up to 90 days in jail, or both, along with the cost of prosecution.

Sources & Official References

Other rules in Blaine

All Blaine rules

Compare Blaine to another location·View the Minnesota solar energy overview

Get notified when Panel Permits in Blaine, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.