Skip to main content
CityRuleLookup

Casper, WY Solar Energy: Panel Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

New solar permit fee
$50 under § 15.32.130
Confirm existing right fee
$10
Adjacent-owner protest window
30 days from notice
Beneficial use deadline
2 years or permit voids
Filed with
City Engineering Director
Appeals go to
Board of Adjustment

Summary

Installing solar panels in Casper doesn't require joining any special program, but a property owner who wants a protected legal right to sunlight must file a solar permit with the Engineering Director under Casper Municipal Code Chapter 15.32. The application discloses the collector's site plan and puts adjacent owners on notice, and any denial can be appealed to the Board of Adjustment.

Any person desiring a solar permit authorized by this chapter shall apply to the city of Casper. The application shall be made upon a form prepared by the city, and the original and two copies shall be filed in the office of the engineering director of the city, and shall contain the following items: A.The name and address of the applicant;B.The common address and legal description of the property on which the solar collector is located or proposed to be located;C.The legal description of property immediately adjacent to the property on which the solar collector is to be located, which may be affected by solar rights granted under the permit, and the names and addresses of the record owners of such properties; ... G.Be accompanied by plans, diagrams, computations and specifications and all other data, as required in Section 15.32.080 of this chapter.

Full Breakdown

Casper's Chapter 15.32 solar-rights ordinance, enacted under W.S. § 34-22-105(b), lets a solar collector owner lock in an unobstructed sightline to the sun rather than merely hoping a neighbor never builds a shading wall. Under § 15.32.070, the applicant files an original plus two copies with the Engineering Director stating the applicant's name and address, the collector site's legal description, the adjacent parcels and their owners' names and addresses, the zoning of both properties, the collector type, and its dimensions, orientation and height, backed by scaled plans and Btu calculations required under § 15.32.080.

The Engineering Director dates and logs the filing, returns any defective application for correction within up to ninety days (§ 15.32.110), and must mail registered notice to every named adjacent owner, who then has thirty days to file a written protest before the City Manager decides the permit and, if protested, before the Board of Adjustment holds a hearing (§ 15.32.120). New applicants pay a fifty-dollar fee; owners confirming a solar right that already existed pay ten dollars, as does anyone voiding or correcting a permit (§ 15.32.130).

A granted permit is void unless the collector is built and put to beneficial use, and that use certified to the City Manager, within two years (§§ 15.32.140, 15.32.210). No solar right attaches against a ten-foot wall on the neighbor's own property line (§ 15.32.180), and a right left unused for five years is deemed abandoned (§ 15.32.190). Applicants denied a permit, or refused certification of beneficial use, may appeal to the Board of Adjustment (§§ 15.32.230 through 15.32.270); missing the appeal window waives further review and the decision becomes final.

Violations & Fines

Chapter 15.32 carries no penalty section of its own, so a person who proceeds without securing or maintaining a valid solar permit, or who disregards a Board of Adjustment ruling on one, falls under Casper's general penalty at § 1.28.010: a misdemeanor punishable by a fine of up to seven hundred fifty dollars, with each day of noncompliance a separate offense under § 1.28.020. Adjacent owners who skip the thirty-day written protest window under § 15.32.120 permanently waive any right to contest the permit or demand a hearing.

Frequently Asked Questions

Do I need this permit just to put solar panels on my roof in Casper?
No. Chapter 15.32 doesn't license the physical installation, only the separate legal 'solar right' to keep future construction on neighboring land from shading your collector. You still need whatever standard building and electrical permits apply to the installation itself; the solar permit is an optional add-on protecting sunlight access after the panels go up.
How much does a Casper solar permit cost?
Fifty dollars if you're establishing a brand-new solar right, or ten dollars if you're confirming a right that already existed before the ordinance took effect, per § 15.32.130. Voiding or correcting an existing permit also costs ten dollars, and the city waives the fee entirely when it is the applicant.
Can my neighbor block my Casper solar permit application?
Yes. The Engineering Director must mail every adjacent owner named in the application a registered notice, and anyone objecting has thirty days to file a written protest under § 15.32.120. A timely protest earns the objector a hearing before the Board of Adjustment before the City Manager's decision becomes final.
What happens if I never build the panels after getting the permit?
The permit and every right it granted become null and void. Section 15.32.210 requires the collector to be built and put to beneficial use, and that use certified to the City Manager, within two years of the permit date, or the solar right disappears entirely.

Sources & Official References

Other rules in Casper

All Casper rules

Compare Casper to another location·View the Wyoming solar energy overview

Get notified when Panel Permits in Casper, WY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.