Citrus Heights, CA Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified April 2026

Key Facts

Law
AB 2188 / SB 379
Review Time
1-3 business days
Scope
Up to 10 kW AC residential
Platform
SolarAPP+ automated
Utility
SMUD NEM 3.0

Summary

Citrus Heights provides expedited solar permits under AB 2188 and SB 379. Residential rooftop systems up to 10 kW AC receive same-day or 1-3 business day approval using the state-standardized checklist. No discretionary design review allowed.

(a) The implementation of consistent statewide standards to achieve the timely and cost-effective installation of solar energy systems is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of solar energy systems, including, but not limited to, design review for aesthetic purposes, and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install solar energy systems. [...] (b) A city or county shall administratively approve applications to install solar energy systems through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install a solar energy system shall be limited to the building official's review of whether it meets all health and safety requirements of local, state, and federal law. [...] (g) (1) On or before September 30, 2015, every city, county, or city and county, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, shall adopt an ordinance, consistent with the goals and intent of subdivision (a), that creates an expedited, streamlined permitting process for small residential rooftop solar energy systems.

Source: Gov Code §65850.5View official code

Full Breakdown

California AB 2188 (2015, Gov Code §65850.5) and SB 379 (2022) require cities with 5,000+ population to implement an expedited, non-discretionary solar permitting process. Citrus Heights complies: residential rooftop PV systems up to 10 kW AC qualify for over-the-counter or same-day online permitting using the CALGreen standard plan set checklist. Plan review must be limited to whether the application meets the checklist, no discretionary design aesthetic review, no HOA-style restrictions on panel location, and no unreasonable fees. SB 379 further requires automated online solar permitting platforms (e.g., SolarAPP+) for most cities. Title 24 Part 6 requires solar on new residential construction (2020 mandate). Permit fees are capped at reasonable administrative cost. Interconnection with SMUD is handled separately through the utility's Net Energy Metering or Net Billing Tariff (NEM 3.0) program.

Frequently Asked Questions

Can Citrus Heights reject my solar permit for aesthetics?
No. AB 2188 prohibits discretionary aesthetic review of residential solar. Review is checklist-only.
Is solar required on new homes?
Yes. Title 24 Part 6 (2020 update) requires solar PV on new single-family and low-rise multifamily construction.

Sources & Official References

Other rules in Citrus Heights

All Citrus Heights rules

California rules heatmap·Compare Citrus Heights to another location·View the California solar energy overview

Get notified when Panel Permits in Citrus Heights, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Sacramento County handle panel permits.

Folsom, CA
Some Restrictions
Elk Grove, CA
Some Restrictions
Isleton, CA
Few Restrictions