Skip to main content
CityRuleLookup

Jackson, NJ Solar Energy: Panel Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Code § 244-133.1, added 2014 (Ord. No. 13-14)
Approval type
Conditional use, only in specified zoning districts
Decommissioning deadline
12 months after facility use ends
New right-of-way limit
Maximum 20 feet wide
Restoration standard
Site restored per § 244-79B(4)

Summary

Jackson Township, New Jersey, in Ocean County requires a conditional-use permit for solar energy facilities under Code § 244-133.1, available only in the zoning districts the ordinance lists. To win approval, an applicant must show available public service infrastructure, screen the array from the Toms River and public roads, and commit to removing all equipment and restoring the parcel within 12 months after the facility stops operating.

§ 244-133.1. Solar energy facilities. ... Solar energy facilities may be permitted as a conditional use in those zoning districts specified, provided the following standards are met: A. Public service infrastructure necessary to support the solar energy facility is available, or can be provided without any off-site development in the PA, FA-1, FA-2 or FA-3 Zone; ... ... D. Any solar energy facility shall be decommissioned within 12 months of the cessation of its utilization. Decommissioning shall include: (1) Removal of all energy facilities, structures and equipment, including any subsurface wires and footings, from the parcel; ... (3) Any other measures necessary to address ecological and visual impacts associated with the solar energy facility, including the removal of off-site infrastructure and restoration of affected lands.

Full Breakdown

Under § 244-133.1 of the Code of the Township of Jackson, added August 12, 2014 by Ordinance No. 13-14, a solar energy facility is permitted only as a conditional use, and only in the zoning districts the chapter specifies for it. The Highway Commercial, Commercial Recreation 1, Commercial Recreation 2 and Neighborhood Commercial Zone sections each cross-reference § 244-133.1 as the baseline conditional-use standard before layering on zone-specific conditions of their own. To qualify, the applicant must first show that public service infrastructure needed to support the facility is already available, or can be extended in the PA, FA-1, FA-2 or FA-3 Pinelands zone without new off-site development.

The facility and any off-site infrastructure must be sited and screened to minimize visual impact as seen from the Toms River, publicly dedicated roads and highways, low-intensity recreational facilities, campgrounds and existing homes on adjoining parcels. Any new or expanded off-site infrastructure is held to the clearing that is actually necessary, and a new right-of-way built to serve the array cannot exceed 20 feet in width unless a safety or reliability need justifies more. Once a facility stops being used, the owner has 12 months to decommission it: remove every energy facility, structure and piece of equipment, including subsurface wires and footings, restore the parcel under § 244-79B(4) unless the land is going into active farming or has already won new development approval within that year, and undo any ecological or visual damage from off-site infrastructure.

Violations & Fines

Skipping any of these standards puts the conditional-use approval itself at risk: the ordinance conditions the right to build the facility on meeting the infrastructure, screening and right-of-way limits, so a project that departs from them was never validly approved. A facility left in place past the 12-month decommissioning deadline is still bound by § 244-133.1D: the owner must remove the panels, mounts, wiring and footings and restore the parcel per § 244-79B(4), regardless of how long the equipment has sat idle.

Frequently Asked Questions

Which zones allow a solar energy facility in Jackson Township?
Section 244-133.1 does not permit solar energy facilities everywhere; it makes them a conditional use only in the districts the Land Use chapter names for that purpose. The Highway Commercial, Commercial Recreation 1, Commercial Recreation 2 and Neighborhood Commercial Zone sections each point back to this section as their baseline standard before adding their own zone-specific conditions.
How long do I have to remove solar equipment after a facility shuts down?
Section 244-133.1D gives the owner 12 months from the date the facility stops being used to fully decommission it. Every energy facility, structure and piece of equipment, including subsurface wires and footings, must come off the parcel, and the site must be restored under § 244-79B(4) unless it is going into active farming or new approved development.
Can a solar project widen roads or clear land to reach the array?
Only to the extent actually necessary. Section 244-133.1C limits any new right-of-way built for the project to 20 feet in width, and clearing for new or expanded off-site infrastructure is capped at what the facility genuinely needs, unless a specific safety or reliability concern justifies going further.

Sources & Official References

Other rules in Jackson

All Jackson rules

Compare Jackson to another location·View the New Jersey solar energy overview

Get notified when Panel Permits in Jackson, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in this county handle panel permits.

Brick, NJ
Some Restrictions
Toms River, NJ
Some Restrictions