Key Facts

Applies to
New single-family homes without full solar install
Roof plan required
Shows panel location, min. 4 hours direct sun
Water heater space
80-gallon heater, expansion tank, heat exchanger
Approval authority
Community Appearance Committee, condition precedent to permit
Appeal deadline
30 days, in writing, to City Commission

Summary

Lauderhill's Land Development Regulations, Article IX Section 3.2.1, require every new single-family home not built with a complete solar system to include roughed-in plumbing, wiring, and roof-plan provisions for later solar installation, subject to Community Appearance Committee review as a condition of the building permit.

3.2.1. Solar energy. This paragraph provides for the design, construction, installation, alteration and repair of equipment and systems using solar energy to provide space heating or cooling, hot water heating and swimming pool heating. All new single family homes, if not installed with a complete solar energy system at that time of construction, must incorporate in their building plan sets the following in order to allow for the later installation of a solar energy system for heating domestic potable water and generation of electricity for on-premises use: ... B.A roof plan showing the location of the solar panels and oriented in a manner that is not visible from a primary frontage and facing a direction where a minimum four (4) hours of direct sunlight can be achieved. ... D.The installation shall conform with all other applicable codes. ... Approval by the committee shall be a condition precedent to the issuance of a building permit.

Full Breakdown

Section 3.2.1 of Article IX, the Community Appearance Committee schedule, requires that any new single-family home not installed with a complete solar energy system at construction incorporate, in its building plan set, the infrastructure needed to add a solar system later for domestic water heating and on-premises electricity generation. Subsection A requires two insulated pipes and a conduit sized for at least two pairs of monitoring and control wires penetrating the roof and ceiling near the water heater location, capped and flashed, and located away from a north-facing roof where at least four hours of direct sunlight is achievable.

Subsection B requires a roof plan showing the solar panel location oriented so panels are not visible from the primary frontage while still capturing at least four hours of direct sunlight. Subsection C requires the water heater storage area to have space for an 80-gallon water heater, an expansion tank, a heat exchanger, and a 120-volt receptacle near the water heater on a circuit with a minimum 15-amp breaker. Subsection D requires the installation to conform with all other applicable codes. Review of the building plans, including these solar-readiness elements, falls to the Community Appearance Committee under Section 3, and Section 4 makes the Committee's approval a condition precedent to issuance of a building permit; the Committee may approve, disapprove, or approve with written conditions, and Section 6.1 allows a written appeal to the City Commission within 30 days.

Violations & Fines

Section 4 makes Community Appearance Committee approval a condition precedent to issuance of a building permit, so a new single-family home built without the required solar-readiness roughing-in cannot lawfully receive its permit. Section 5 makes these renewable-energy-readiness requirements cumulative with all other Land Development Regulations and code requirements, so compliance does not excuse a builder from separately meeting the Florida Building Code. An applicant denied approval may appeal in writing to the Director of the Community Development Department within 30 days under Section 6.1, with the City Commission deciding the appeal under Section 6.2.

Frequently Asked Questions

Do new homes in Lauderhill have to be solar-ready?
Yes. Section 3.2.1 requires new single-family homes not built with a complete solar system to include roughed-in piping, wiring conduit, and a roof plan in their building plan set so a solar system can be added later.
Who approves the solar-readiness plans?
The Community Appearance Committee reviews the building plans under Article IX, Section 3, and its approval is a condition precedent to issuance of a building permit under Section 4.
Where must the solar panels be located on the roof?
Section 3.2.1.B requires the roof plan to orient panels so they are not visible from the primary frontage while still capturing at least four hours of direct sunlight.

Sources & Official References

Other rules in Lauderhill

All Lauderhill rules

Florida rules heatmap·Compare Lauderhill to another location·View the Florida solar energy overview

Get notified when Panel Permits in Lauderhill, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Panel Permits in Nearby Cities

How other cities in Broward County handle panel permits.

Hollywood, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions
Coral Springs, FL
Some Restrictions
Fort Lauderdale, FL
Some Restrictions