Key Facts
- Residential 1-2 family system
- $250 flat Building Subcode fee
- Electrical fee
- $660 first 10kW, $150 each additional 10kW
- Fire subcode, residential solar
- $114 each
- Fire subcode, commercial
- $228 for 1-50 panels; $150 per 100 panels over 50
- Zoning permit
- Required in addition to a building permit (§ 30-3)
- Tree removal
- Replacement under § 97-7
Summary
Solar work in Monroe Township, Middlesex County, goes through the State Uniform Construction Code Enforcing Agency headed by the Construction Official, and the Chapter 39 fee schedule prices it by subcode. A residential one or two family system carries a $250 flat Building Subcode fee, and the electrical fee is $660 for the first 10kW plus $150 for each additional 10kW.
N. Solar System Only for Residential 1 - 2 Family Dwelling (R-5) Flat fee $250 ... F. SOLAR INSTALLATIONS For each solar photovoltaic system, the fee shall be: Includes all equipment for the system For the first 10kW $660 For each additional 10kW $150
Full Breakdown
Solar work in Monroe Township runs through the State Uniform Construction Code Enforcing Agency created by § 25-1, which consists of a Construction Official, Building Subcode Official, Plumbing Subcode Official, Electrical Subcode Official and Fire Protection Subcode Official. Section 25-2 sends the Construction Office's fees to Chapter 39, where each subcode prices solar separately. The Building Subcode Fees Schedule II lists a solar system only for a residential 1 - 2 family dwelling (R-5) at a $250 flat fee. The Electrical Subcode Fee Schedule III charges, for each solar photovoltaic system including all equipment for the system, $660 for the first 10kW and $150 for each additional 10kW, and it lists solar meters among the equipment priced by ampere rating. The Fire Protection Subcode Fee Schedule V lists residential solar at $114 each, commercial solar of 1-50 panels at $228, and commercial solar over 50 panels at $150 per 100 panels or portion thereof.
Zoning is a separate step. Section 30-3 says a zoning permit is required in addition to a building permit, and § 108-3.4(B)(1) bars erecting, altering or installing a structure until the Zoning Officer issues a zoning permit. Chapter 39 prints zoning permit application fees of $100 for nonresidential uses and $25 for residential uses. Trees come into it as well: the definition of SOLAR in the tree preservation chapter says all trees removed for solar installations will be replaced in accordance with § 97-7, so a clearing plan for an array carries a replacement obligation.
Violations & Fines
A structure erected or altered contrary to the development regulations is a violation under § 30-4, punishable by a fine of not less than $100 nor more than $1,000 or imprisonment in the county jail for up to 90 days, at the discretion of the Municipal Court. Each day the violation continues after notice and a reasonable opportunity to cure is a separate violation (§ 30-6). The Zoning Officer can order correction on 10 days' notice before a summons issues (§ 30-5).
Frequently Asked Questions
How much is a residential solar permit in Monroe Township?
Does a solar installation also need a zoning permit?
Are commercial solar fees different?
What happens to trees removed for a solar array?
Sources & Official References
Other rules in Monroe Township (Middlesex County)
Compare Monroe Township (Middlesex County) to another location·View the New Jersey solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Panel Permits in Nearby Cities
How other cities in this county handle panel permits.