Jonesboro, AR Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Jonesboro, AR, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Permit required
- Before any structure, including pools
- Issued by
- City building inspector
- Late-start penalty
- Double the standard permit fee
- New-construction permit life
- 6 months, or 18 if work in progress
- Pool defined at
- 15 inches deep or more, Sec. 105-229
Summary
Jonesboro requires a building permit before any structure, including a residential swimming pool, is built. The building inspector must confirm the work conforms to the code before issuing it, and starting work first doubles the permit fee.
It shall be unlawful to commence the construction, reconstruction, moving, demolishing or structural alteration of any building until the building inspector has issued a building permit for such work. ... Before beginning any work, except grading, within the city, the person responsible for building a structure shall make application for a building permit and shall pay all fees for said construction. A double fee shall be assessed to any person, firm or contractor commencing any work prior to issuance of a building permit.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 16).
Full Breakdown
Chapter 105's general permit provision, Sec. 105-23, governs before any structure goes into the ground in the city. Subsection (c) makes it unlawful to commence construction of any building or structure until the building inspector has issued a building permit, and the inspector cannot issue one unless the proposed construction conforms to the chapter and other applicable building laws. Subsection (g) is explicit that before beginning any work, except grading, the person responsible for building a structure must apply for a building permit and pay all required fees; a double fee applies to anyone who starts before the permit issues.
Article VIII of the same chapter (Secs. 105-229, 105-230) separately regulates swimming pools as structures once built, defining 'swimming pool' as any body of water 15 inches or more in depth in an artificial or semi-artificial container, and requiring the protective enclosure described in Sec. 105-230. A permit for renovating an existing structure, including pool-adjacent work, is barred outright while condemnation proceedings on that structure are final under subsection (f). New-construction permits expire six months from issue unless substantial work is shown to be in progress, in which case they run 18 months.
Violations & Fines
Commencing construction, including a pool, before the building inspector issues a permit is unlawful under Sec. 105-23(c). A person who begins work before applying for or paying for the permit is assessed a double fee under Sec. 105-23(g). No permit will issue at all where the proposed work does not conform to the chapter's requirements.
Frequently Asked Questions
Do I need a permit to build a pool in Jonesboro?
What happens if I start building a pool before getting a permit?
How long is a Jonesboro building permit valid?
Sources & Official References
Other rules in Jonesboro
Compare Jonesboro to another location·View the Arkansas swimming pools & spas overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.