Swimming pool permit rules in Stonecrest, GA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit needed
in-ground or deep pools
Exempt
prefab pools under 24 in. deep, above-ground
Adopted standard
International Pool and Spa Code
Site plan required
shows lot-line distances
Unpermitted penalty
100% of permit fee
Permit review
up to 60 calendar days

Summary

In the City of Stonecrest, building a residential swimming pool needs the same construction permit required for any structure under Sec. 7-118(a) of the city code. Only shallow, fully above-ground prefabricated pools under 24 inches deep skip the permit process under Sec. 7-118(d)(1)f; anything deeper or built into the ground needs Building Official review first.

(a)Permit required. A permit shall be obtained before beginning construction, erection, alteration or repair to a building or structure, mechanical system, gas system, plumbing system, electrical system, and energy conservation system, other than ordinary repairs. ... f.Prefabricated swimming pools that are less than 24 inches (610 mm) deep and are installed entirely above ground.

Full Breakdown

Sec. 7-118(a) states that a permit shall be obtained before beginning construction, erection, alteration or repair to a building or structure, other than ordinary repairs, and a swimming pool counts as a structure subject to that rule. The only pool-specific carve-out in the exemption list at Sec. 7-118(d)(1)f covers prefabricated swimming pools less than 24 inches deep that are installed entirely above ground. Anything in-ground, anything deeper than 24 inches, or any pool with a permanent enclosure must go through the standard permit application in Sec.

7-118(e), which requires a written application, a site plan identifying the pool's location relative to property lines, construction plans, and the property owner's signature. Sec. 7-119(g) further requires that construction plans for a permitted structure include a site plan drawn to an accurate boundary line survey showing distances from lot lines, which is how pool placement gets checked against setbacks. The Building Official has up to 60 calendar days under Sec. 7-118(f) to examine the application, and any pool permit lapses if work has not begun within 180 days of issuance or if 180 days pass without a required inspection, per Sec.

7-118(i). Starting pool construction before the permit issues triggers the same penalty as any other unpermitted work: 100 percent of the usual permit fee added to the fee itself, plus a Stop Work Order, under Sec. 7-118(c). Because the technical codes adopted in Sec. 7-23(a)(9) include the International Pool and Spa Code, in-ground pool work must also meet that code's construction standards once permitted.

Violations & Fines

Building or installing an in-ground or over-24-inch pool without first obtaining a permit is a Sec. 7-118(c) violation: the Building Official assesses a penalty equal to 100 percent of the standard permit fee on top of the fee owed, and issues a Stop Work Order halting construction until the permit is secured and the work is brought into compliance.

Frequently Asked Questions

Does an above-ground pool need a permit in Stonecrest?
Only if it is deeper than 24 inches. Sec. 7-118(d)(1)f exempts prefabricated above-ground pools under 24 inches deep from the permit requirement; anything deeper, or any in-ground pool, needs the same construction permit required for any other structure.
What has to be submitted with a Stonecrest pool permit application?
Sec. 7-118(e) requires a written application describing the work, a site plan locating the pool by street address or legal description, construction plans and documents, the proposed valuation of the work, and the signatures of both the applicant/contractor and the property owner.
What code governs pool construction once a permit is issued?
Sec. 7-23(a)(9) adopts the International Pool and Spa Code as one of the State Minimum Standard Mandatory Codes enforced in the city, so permitted pool construction must meet that code's requirements along with any applicable zoning setbacks.

Sources & Official References

Other rules in Stonecrest

All Stonecrest rules

Compare Stonecrest to another location·View the Georgia swimming pools & spas overview

Get notified when Pool Permits in Stonecrest, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.