Skip to main content
CityRuleLookup

Winston-Salem, NC Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Winston-Salem, NC, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Governing section
Code § 10-2(a) permit requirement
Electrical permit fee
$138.00 under § 10-243(a)(3)
Permit voids if unstarted
within 6 months
Permit voids if halted
12 months discontinued
Enforcing office
Inspections division

Summary

Winston-Salem requires a building permit before constructing a residential swimming pool, plus a separate electrical permit with its own $138.00 fee, under the city's building regulations chapter enforced by the inspections division.

No person shall commence or proceed with: (1) The construction, reconstruction, alteration, repair, movement to another site, removal or demolition of any building or structure; ... without first securing from the inspections division any and all permits required by the state building code and any other state or local laws applicable to the work.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 102 | Personnel: Supplement 96 | Water and Sewer: Supplement 56 | Solid Waste: Supplement 15).

Full Breakdown

Under Sec. 10-2(a), no one may commence construction, alteration, or repair of any building or structure in Winston-Salem without first securing a permit from the inspections division, and Sec. 10-1 adopts the North Carolina State Building Code, which governs a pool as a structure subject to that permit. The fee schedule at Sec. 10-243(a)(3) separately lists a $138.00 electrical permit specifically for swimming pools, confirming pools are treated as their own permitted category. Under Sec. 10-2(e), a permit becomes void if work isn't started within six months or is discontinued for 12 months, requiring a new permit and fee before work resumes.

Violations & Fines

Working without the required permit draws a late fee equal to the permit cost plus possible stop-work orders; violating Sec. 10-2 is a class 3 misdemeanor under G.S. 14-4, punishable by a fine of up to $500.00.

Frequently Asked Questions

Do I need a permit to build a pool in Winston-Salem?
Yes. Sec. 10-2(a) requires a permit from the inspections division before constructing any building or structure, which covers residential swimming pools under the adopted North Carolina State Building Code.
How much does the pool electrical permit cost?
The fee schedule at Sec. 10-243(a)(3) sets a flat $138.00 electrical permit fee specifically for swimming pools, separate from the structural building permit fee.
What happens if I build a pool without a permit?
The city charges a late fee equal to the permit cost and can issue a stop-work order; violating the permit requirement is a class 3 misdemeanor under G.S. 14-4 with a fine up to $500.00.

Sources & Official References

Other rules in Winston-Salem

All Winston-Salem rules

Compare Winston-Salem to another location·View the North Carolina swimming pools & spas overview

Get notified when Pool Permits in Winston-Salem, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.