Skip to main content
CityRuleLookup

Port St. Lucie, FL Trash & Recycling: Dumpster Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum enclosure size
12 ft by 12 ft
Professional-zoned enclosure minimum
6 ft by 12 ft
Enclosure wall requirement
5-foot masonry wall
Container spacing
3 feet minimum
Shared enclosure threshold
under 50 units or 10,000 sq ft

Summary

Every multi-family, commercial, industrial, office, and institutional property in Port St. Lucie must screen its refuse and recycling dumpsters behind a five-foot masonry enclosure at least 12 feet by 12 feet, per Zoning Code Section 158.232, and mechanical containers must meet the design standards the director sets under Code Section 80.09.

(A)Location and Number. Refuse and recycling dumpsters utilized at multi-family residential complexes, commercial, industrial, office, and institutional facilities shall be located in areas that minimize public view. Gates shall not face a street, whenever possible. All uses, excluding single-family residential uses, that generate refuse shall provide one or more locations for enclosed and gated refuse and recycling dumpsters even if curbside pick-up is utilized, unless indicated otherwise...(B)Screening. Refuse and recycling dumpsters shall be screened from view on all sides and shall be gated. The enclosure shall consist of a five-foot high masonry wall. Gate facing shall be constructed of a solid material with the option of using wood, metal or other "solid" material and shall have a sign attached indicating "recycle." Gate framework shall be constructed of metal. Gates may be left open only on scheduled pick up days and must be closed following pick-up.(C)Size. Each dumpster enclosure shall measure at least 12-foot by 12-foot in area to accommodate refuse and recycling dumpsters.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 103).

Full Breakdown

Section 158.232 of the Zoning Code governs where a business or multi-family complex may put its dumpsters. Every non-single-family use that generates refuse must provide one or more enclosed, gated locations for refuse and recycling dumpsters, even if the property also gets curbside pickup, and the Zoning Administrator can only waive that when a multi-family development has fewer than five units per acre and its hauler agrees to curbside service instead. Gates on the enclosure may not face a street whenever that's possible, and an applicant can ask to swap in a screened compactor area during site plan review instead of the standard dumpster pad.

The enclosure itself has to be built to a standard: a five-foot masonry wall on all sides, a solid gate of wood, metal, or similar material bearing a sign that says 'recycle,' and a metal gate frame. Gates can only stand open on the scheduled pickup day and must be closed again right after the truck leaves. The pad has to measure at least 12 feet by 12 feet, though the Zoning Administrator or Site Plan Review Committee can adjust that for a Professional-zoned property, down to 6 by 12 feet, after weighing the site's size and use. Smaller sites, those under 10,000 square feet of nonresidential floor area or fewer than 50 dwelling units, may share one enclosure across an adjoining property line if the owners record a joint-use and maintenance agreement.

On the collection side, Code Section 80.09 requires every mechanical container to carry the director's approval, have four permanently attached solid sides and a bottom, and either an attached lid or, for construction and demolition roll-offs, an open top. Containers have to sit at least three feet from any object or other container so the collection truck can service them.

Violations & Fines

A property that skips the required dumpster enclosure, leaves gates open outside pickup hours, or uses an undersized or unapproved container is subject to code enforcement action and civil citation under the city's general code compliance process in Chapters 37 and 40, which can escalate to a Special Magistrate hearing and daily fines for each day the violation continues.

Frequently Asked Questions

Do all commercial properties need a dumpster enclosure in Port St. Lucie?
Yes, under Zoning Code Section 158.232 every use except single-family residential that generates refuse must provide at least one enclosed, gated dumpster area, even if the property also uses curbside pickup. Only smaller multi-family developments under five units per acre with curbside hauler service can skip it.
How big does the dumpster enclosure have to be?
Section 158.232(C) sets a 12-foot by 12-foot minimum so it can hold both a refuse and a recycling dumpster, though a Professional-zoned property can drop to 6 by 12 feet, and the Zoning Administrator can adjust the size after reviewing the site.
Can two businesses share one dumpster enclosure?
Yes. Section 158.232(D) allows shared enclosures along a property line for sites under 10,000 square feet of nonresidential floor area or fewer than 50 dwelling units, as long as the owners record a perpetual joint-use and maintenance agreement.
What are mechanical containers required to look like?
Code Section 80.09 requires the director's approval, four permanently attached solid sides and a bottom, and an attached lid unless it's an open-top roll-off used for construction debris. Containers must sit at least three feet from any object for the collection truck to service them safely.

Sources & Official References

Other rules in Port St. Lucie

All Port St. Lucie rules

Florida rules heatmap·Compare Port St. Lucie to another location·View the Florida trash & recycling overview

Get notified when Dumpster Rules in Port St. Lucie, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.