Bartow County, GA Water Use Rules: Recycled Water Rules (2026)
Key Facts
- Effective date
- January 1, 2011
- Recycled water minimum
- At least 50 percent of water used
- Covered facilities
- Commercial conveyor car washes only
- Exempt
- Self-service bays and in-bay automatic washes
- Citation
- Bartow County Code § 18-130 (also § 18-132)
Summary
Commercial conveyor car washes built or permitted in unincorporated Bartow County after January 1, 2011 must install a recycled water system that captures and reuses wash and rinse water, recycling at least 50 percent of the water used. Bartow County Code § 18-130 sets the mandate; self-service and in-bay automatic washes are exempt.
Effective January 1, 2011, any commercial conveyor car wash (as defined herein) that is permitted and constructed, shall install a recycled water system which captures and reuses water previously used in wash or rinse cycles. A minimum of 50 percent of the water utilized shall be recycled. A "commercial conveyor car wash" is a commercial car wash where the car moves on a conveyor belt during the wash (regardless of whether the driver remains in the vehicle or not). These restrictions shall not apply to self-service car wash bays or in-bay car washes where the car remains stationary and the wash equipment moves around the vehicle.
Full Breakdown
Bartow County Code § 18-130 requires any commercial conveyor car wash, defined as a commercial car wash where the vehicle moves on a conveyor belt during the wash regardless of whether the driver stays in the vehicle, that is permitted and constructed after January 1, 2011 to install a recycled water system capturing and reusing water previously used in wash or rinse cycles. The ordinance sets a numeric floor: at least 50 percent of the water the facility uses must be recycled water rather than fresh water drawn from the county system.
The requirement is written into Bartow County's building code chapter and enforced by Building Inspections as part of the commercial permitting process for a new or reconstructed conveyor wash facility, alongside the general building permit requirement in § 18-117. The mandate carries a narrow exemption: it does not apply to self-service car wash bays, where the customer washes their own vehicle, or to in-bay automatic washes where the vehicle stays stationary and the wash equipment moves around it; only the conveyor-belt format is covered. The same recycled water text appears a second time in the code at § 18-132, adopted by a separate 2011 ordinance, an artifact of two amendments each redesignated by the code's editor to avoid a numbering conflict, but the substantive requirement, the 50 percent recycled water floor for new conveyor car washes, is identical in both sections.
Violations & Fines
A conveyor car wash built or permitted after January 1, 2011 without the required recycled water system is out of compliance with Bartow County Code § 18-130. Noncompliant construction work is subject to citation, stop-work order, or other civil remedy from the building official under § 18-116, and beginning construction without the required permit adds a 100 percent penalty on the usual permit fee under § 18-253.
Frequently Asked Questions
Which car washes have to recycle water in unincorporated Bartow County?
Does a self-service car wash have to install a recycled water system?
Why does the code list this recycled water rule twice?
Sources & Official References
Other rules in Bartow County
Compare Bartow County to another location·View the Georgia water use rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.