Madera, CA Accessory Structures: ADU Impact Fees (2026)
Key Facts
- Governing section
- Madera Municipal Code § 10-3.513(E)(3)
- New/detached/attached ADU
- Utility connection fee applies
- Internal conversion ADU
- No connection fee required
- Junior ADU
- No utility connection fee at all
- Permit fee
- Standard Zoning Administrator Permit fee due at submittal
Summary
Madera requires a separate utility connection fee or capacity charge for most new ADUs under § 10-3.513(E)(3), but waives it for ADUs built entirely inside existing living space. Junior ADUs are exempt from utility connection fees altogether.
(3) Utility connection fees. (a) Except as provided in subsection (3)(b), a separate new utility connection and payment of a connection fee or capacity charge pursuant to state law and city fee schedule will be required for any new accessory dwelling unit. (b) No new or separate utility connection or related connection fee or capacity charge will be required for accessory dwelling units that are internal conversions of existing space within a single family residence or permitted accessory structure constructed as habitable space.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2024 S-50: Current through Ordinance 1010 C.S., passed 6-5-24).
Full Breakdown
513(E)(3) sets the city's utility-fee policy for accessory dwelling units. Except as provided in subsection (3)(b), a new accessory dwelling unit must obtain a separate new utility connection and pay a connection fee or capacity charge set by state law and the city's fee schedule. The exception matters for anyone converting existing space: no new or separate utility connection, and no related connection fee or capacity charge, is required when the ADU is an internal conversion of existing space within a single-family residence or a permitted accessory structure already built as habitable space.
Beyond utility fees, an applicant still pays the standard Zoning Administrator Permit fee at time of submittal under subsection (E)(1)(h), and the permit application is otherwise processed alongside the building permit rather than as a separate track. 513(G)(3)(c): no new or separate utility connection and no connection fee for water, sewer, or power is required at all for a JADU, reflecting that a JADU must be built entirely within an existing home's walls and cannot add the same service demand as a new detached structure.
Violations & Fines
There is no separate penalty clause for the fee provision itself; the fee is a precondition to the Zoning Administrator Permit under subsection (E), so a project that proceeds without paying the required connection fee or capacity charge cannot receive final approval or a certificate of occupancy for the unit.
Frequently Asked Questions
Does Madera charge a utility fee for a new ADU?
Is there an exception to Madera's ADU utility fee?
Do junior ADUs pay the same utility fees in Madera?
Sources & Official References
Other rules in Madera
California rules heatmap·Compare Madera to another location·View the California accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.