Skip to main content
CityRuleLookup

Rohnert Park, CA Accessory Structures: ADU Impact Fees (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Small ADU exemption
No impact fee under 750 square feet, § 17.08.040(H)(4)
JADU exemption
No impact fee on any JADU regardless of size
Larger ADU fee
Prorated to ADU's share of primary dwelling's square footage
Utility connection
New connection required only if site conditions necessitate it
Verification
City engineer must confirm adequate service before occupancy, § (H)(2)

Summary

Rohnert Park exempts small accessory dwelling units from impact fees entirely and prorates fees for larger ones. Under RPMC § 17.08.040(H), no impact fee applies to an ADU under 750 square feet or to any JADU, while an ADU of 750 square feet or more is charged proportionately to the primary dwelling's square footage rather than as a new residential unit.

H.Capacity, Connection and Impact Fees.1.Except for the case where an ADU or JADU is constructed within an existing single-family dwelling unit in accordance with Section 17.08.840(E)(1), a new, separate or upgraded utility connection may be required between the primary residence/ADU and the public water or sewer utility if site specific conditions necessitate a new connection in order to provide minimum levels of utility service. ... 4.No impact fee shall be assessed upon the development of an ADU less than seven hundred fifty square feet or any JADU, and impact fees charged for an accessory dwelling unit of seven hundred fifty square feet or more shall be charged proportionately in relation to the square footage of the primary dwelling unit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51 Update 2).

Full Breakdown

040(H) sets the city's connection, capacity and impact fee rules for ADUs and JADUs separately from its general design and setback standards. Subsection (H)(1) allows a new, separate or upgraded water or sewer connection only where site-specific conditions actually require one, and lets the city calculate connection fees or capacity charges proportionate to the ADU's burden, using square footage, drainage fixture unit values under the Uniform Plumbing Code, or another method that reasonably estimates the ADU's proportional impact, rather than charging the full new-connection rate.

Subsection (H)(2) requires the applicant to show the city engineer that adequate water and sewer service already exists before a certificate of occupancy issues. Subsection (H)(3) states that a JADU is never treated as a separate or new dwelling unit for water, sewer or power purposes, including connection fees, and an ADU is not treated as a new residential use for connection fee or capacity charge purposes unless it is built together with a new single-family dwelling. The headline exemption sits in (H)(4): no impact fee at all may be assessed on an ADU under 750 square feet or on any JADU regardless of size, and once an ADU reaches 750 square feet or larger, the impact fee charged must be proportional to the ADU's square footage relative to the primary dwelling, not a flat new-unit fee. Subsection (H)(1) also carves out an exception for ADUs built within an existing single-family dwelling, which typically need no new utility connection at all.

Violations & Fines

Charging a flat, non-prorated impact fee on an ADU 750 square feet or larger, or any impact fee at all on an ADU under 750 square feet or a JADU, conflicts with RPMC § 17.08.040(H)(4); an applicant who believes a fee was miscalculated can raise it with the city engineer under subsection (H)(2) before the certificate of occupancy for the ADU is issued.

Frequently Asked Questions

Do Rohnert Park ADUs pay city impact fees?
Not if the ADU is under 750 square feet, and never for a JADU of any size, under RPMC § 17.08.040(H)(4). Once an ADU reaches 750 square feet, the impact fee is prorated to the ADU's square footage relative to the primary dwelling rather than charged as a flat new-unit fee.
Does an ADU need its own water or sewer connection in Rohnert Park?
Only if site-specific conditions require one. RPMC § 17.08.040(H)(1) allows the city to require a new, separate or upgraded connection when needed, with fees prorated to the ADU's actual burden using square footage or plumbing fixture values, but an ADU built inside the existing house typically needs no new connection.
Is a JADU billed as a new dwelling unit for utilities in Rohnert Park?
No. RPMC § 17.08.040(H)(3) states a JADU is never treated as a separate or new dwelling unit for water, sewer or power purposes, including connection fees, and an ADU is treated as new only if it is constructed together with a new single-family dwelling.

Sources & Official References

Other rules in Rohnert Park

All Rohnert Park rules

California rules heatmap·Compare Rohnert Park to another location·View the California accessory structures overview

Get notified when ADU Impact Fees in Rohnert Park, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

ADU Impact Fees in Nearby Cities

How other cities in Sonoma County handle adu impact fees.

Santa Rosa, CA
Some Restrictions
Petaluma, CA
Few Restrictions