Skip to main content
CityRuleLookup

La Habra, CA Accessory Structures: ADU Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

ADU rules in La Habra, CA, also called accessory dwelling unit regulations or granny flat ordinances, cover setbacks, owner-occupancy, parking, and permit requirements.

Key Facts

Review deadline
60 days, ministerial approval
Expedited review
30 days for preapproved/identical plans
ADU/JADU cap
1 ADU + 1 JADU per single-unit lot
Missed deadline
Application deemed approved automatically
Building standards
Must meet Title 15 and state efficiency-unit minimum
Enforcing department
La Habra Community Development

Summary

In the City of La Habra, accessory dwelling units and junior ADUs are governed by Municipal Code § 18.12.150, which requires the city to ministerially approve or deny a complete application within sixty days. Only one ADU and one JADU may be built on a single-unit residentially zoned lot, and ADUs are allowed with multi-unit dwellings only under the section's separate multi-unit provisions.

§ 18.12.150. Accessory dwelling units and junior accessory dwelling units. ... ... B. Applications - ADUs and JADUs. 1. Applications for ADUs and JADUs shall be ministerially approved or denied within sixty days of receipt of a complete application. An application shall be approved if it complies with the requirements of this section. ... ... G. Number of ADUs and JADUs. Except as specified in Section 18.12.150.N, below, only one ADU and one JADU may be built on a single-unit residentially zoned lot. ADUs shall only be allowed in conjunction with multi-unit dwelling units as provided for in Section 18.12.150.N, below.

Full Breakdown

Municipal Code § 18.12.150 lays out La Habra's local standards for accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs), adopted to track California Government Code Section 66314 et seq. for ADUs and Section 66333 et seq. for JADUs while preserving neighborhood character. Subsection B.1 requires the city to ministerially approve or deny a complete ADU or JADU application within sixty days, and if the city denies it, subsection B.1.b requires written comments listing every defect and how to fix it, within that same sixty-day window.

If an applicant uses a plan already preapproved by the city, or identical to a plan approved for another detached ADU within the current triennial California Building Standards Code cycle, subsection B.1.f shortens that review to thirty days. Subsection B.1.c lets a detached garage being replaced by an ADU have its demolition permit reviewed and issued together with the ADU application, and B.1.e deems the application approved automatically if the city misses its deadline. Subsection G caps the number of units at one ADU and one JADU on a single-unit residentially zoned lot, except for the multi-unit provisions of subsection N, and states that ADUs are allowed with multi-unit dwellings only under that same subsection N.

Subsection K.1 confirms an ADU is permitted anywhere a single-unit or multi-unit dwelling is a permitted, or even conditionally permitted, use, whether the ADU sits within, attached to, or detached from the primary unit. Subsections I.2 through I.4 require ADUs to meet Title 15 building standards and the state efficiency-unit floor-area minimum, while generally exempting them from fire-sprinkler retrofits and Group R occupancy reclassification.

Violations & Fines

Building or occupying an ADU or JADU without an approved application, or in violation of the standards in § 18.12.150, is treated as a zoning code violation: a misdemeanor under Chapter 1.08.010 punishable by a fine up to five hundred dollars, up to six months in jail, or both, unless the city elects to charge it as an infraction, with each day of the violation a separate offense.

Frequently Asked Questions

How long does La Habra take to approve an ADU application?
Section 18.12.150(B)(1) requires the city to ministerially approve or deny a complete ADU or JADU application within sixty days. If the city denies it, written comments explaining every defect must go out within that same sixty-day window, and if the city misses the deadline entirely, subsection B.1.e deems the application automatically approved.
How many ADUs can I build on my lot in La Habra?
Section 18.12.150(G) limits a single-unit residentially zoned lot to one ADU and one JADU, except under the multi-unit provisions of subsection N. On a multi-unit or mixed-use property, ADUs are allowed only as provided in that same subsection N.
Can I replace my garage with an ADU faster?
Yes. Section 18.12.150(B)(1)(c) lets the demolition permit for the existing garage be reviewed and issued at the same time as the ADU application, and subsection B.1.f shortens the review to thirty days if the plan is preapproved by the city or identical to another approved detached ADU plan within the current building code cycle.

Sources & Official References

Other rules in La Habra

All La Habra rules

How La Habra compares: Easiest Cities to Build an ADU·California rules heatmap·Compare La Habra to another location·View the California accessory structures overview

Get notified when ADU Rules in La Habra, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

ADU Rules in Nearby Cities

How other cities in Orange County handle adu rules.

Santa Ana, CA
Some Restrictions
Fullerton, CA
Some Restrictions
Orange, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Anaheim, CA
Some Restrictions
Garden Grove, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions
Irvine, CA
Few Restrictions