Garden Grove, CA Accessory Structures: ADU Rules (2026)
ADU rules in Garden Grove, CA, also called accessory dwelling unit regulations or granny flat ordinances, cover setbacks, owner-occupancy, parking, and permit requirements.
Key Facts
- Max on single-family lot
- 1 ADU + 1 JADU
- Max detached ADUs, existing multi-family lot
- 8 units
- Min unit size
- 150 sq ft (efficiency)
- Review type
- Ministerial, no hearing
- Standard review timeline
- 60 days
- Pre-approved plan timeline
- 30 days
- Setback/FAR waived up to
- 800 sq ft ADU
Summary
Garden Grove allows one ADU on any lot zoned for single-family or multi-family residential use under Municipal Code Section 9.54.020. JADUs are limited to lots zoned single-family. Multi-family lots may add up to eight detached ADUs, and the City reviews complete applications ministerially, without a hearing, within 60 days.
A. Permitted ADU Locations. ADUs conforming to the provisions in this chapter may be located on any lot in the City that is zoned to allow single-family or multiple-family residential uses and that includes a proposed or existing legally developed single-family or multiple-family dwelling. B. Permitted JADU Locations. JADUs conforming to the provisions in this chapter may be located within a proposed or existing legally developed single-family dwelling on any lot in the City that is zoned to allow single-family residential uses.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4903654; v10 updated 2026-05-12).
Full Breakdown
020, ADUs are allowed by right on any lot in Garden Grove zoned to allow single-family or multiple-family residential use that already has, or is proposed to have, a legally developed dwelling; JADUs are confined to lots zoned single-family. 030 caps a single-family lot at one ADU plus one JADU. Multi-family lots get more room: up to eight detached ADUs on a lot with an existing multi-family building (never more than the number of existing units), up to two detached ADUs on a lot proposed for new multi-family development, and one or more converted ADUs built inside non-livable space, capped at 25% of the existing multi-family unit count.
040 sets minimum unit sizes of 150 square feet for an efficiency unit, 220 for a studio, 500 for one bedroom, and 700 for two or more bedrooms, and overrides floor-area-ratio, front-setback, building-separation, lot-coverage, open-space, or minimum-lot-size standards to the extent needed to allow construction of an ADU up to 800 square feet. 070, or within 30 days for a City pre-approved or previously approved detached ADU plan. Existing nonconforming zoning conditions, building code violations, or unpermitted structures that do not threaten health and safety are not grounds to deny the permit, and an ADU does not trigger a fire-sprinkler retrofit of the primary home if sprinklers were not already required there.
Violations & Fines
Building an ADU or JADU without a permit is enforced through the Municipal Code's general penalty at Section 1.04.010: a misdemeanor punishable by up to a $1,000 fine, six months in county jail, or both, with each day of an unpermitted structure treated as a separate offense. Code Enforcement can also pursue an unpermitted ADU as a zoning violation requiring correction or removal.
Frequently Asked Questions
Can I build more than one ADU on my Garden Grove property?
Does my Garden Grove ADU need a public hearing?
Will my ADU be blocked by my lot's setback or lot-coverage rules?
How small can a Garden Grove ADU be?
Sources & Official References
Other rules in Garden Grove
How Garden Grove compares: Easiest Cities to Build an ADU·California rules heatmap·Compare Garden Grove to another location·View the California accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.