Broomfield, CO Accessory Structures: Garage Conversions (2026)
Garage conversion rules in Broomfield, CO, sometimes called garage-to-ADU or accessory living unit conversions, govern permits, ceiling height, egress, and parking replacement.
Key Facts
- Exemption
- Garage conversions/additions to existing dwellings
- Fee avoided
- $1.00 per square foot
- Also excluded
- Garages, unfinished basements in new builds
- Still required
- Standard building permit and inspection
- Adopted
- Ord. 1165 (1995), amended Ord. 1174 (1996)
Summary
Converting an existing garage into living space, or adding onto an existing dwelling, does not trigger Broomfield's $1.00-per-square-foot services expansion fee. Section 3-28-050(B) exempts garage conversions and additions to existing dwellings outright, and separately excludes garages and unfinished basements from the fee on brand-new residential construction.
(B)Neither garages and unfinished basements on new residential construction nor garage conversions or additions to existing dwellings shall be subject to the services expansion fee.
Full Breakdown
Broomfield's services expansion fee, chapter 3-28, charges $1.00 for every square foot of total floor area on new residential construction under section 3-28-040(B), payable before the building official issues a certificate of occupancy. Section 3-28-050 lists exceptions to that charge, and subsection (B) covers two distinct situations relevant to garages: first, garages and unfinished basements built as part of brand-new residential construction are not counted toward the fee in the first place; second, and separately, garage conversions or additions to existing dwellings, homes that already exist, are not subject to the services expansion fee at all when the owner later finishes that space into living area or adds on.
That means a homeowner turning an attached garage into a bedroom, home office, or in-law space owes no services expansion fee on the converted square footage, even though a brand-new house of the same size would be billed $1.00 per square foot under section 3-28-040(B). The exemption is narrow: it covers only this excise tax under chapter 3-28. The conversion still needs its own building permit and inspection under the adopted building codes referenced in section 3-28-030(A), and other city fees tied to that permit, plan review, or utility connections are unaffected. Section 3-28-050 was adopted with the original 1995 ordinance and amended in 1996 and again in 2019.
Violations & Fines
This section is an exemption, not a prohibition, so a qualifying garage conversion carries no penalty. But a project that does not actually qualify, for example new construction of a garage-style structure into a separate dwelling unit, still owes the section 3-28-040(B) fee, and the building official will withhold the certificate of occupancy under section 3-28-040(C) until it is paid, backed by chapter 1-12 penalties up to $2,650.00 or 364 days imprisonment.
Frequently Asked Questions
Do I owe Broomfield's services expansion fee for converting my garage into a bedroom?
Does an unfinished basement in a newly built Broomfield home get taxed under this fee?
Do I still need a permit to convert my garage even though the fee is waived?
If I finish my basement into living space years after the home is built, does the fee apply retroactively?
Sources & Official References
Other rules in Broomfield
Compare Broomfield to another location·View the Colorado accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.