Brookhaven, NY Building Safety: Building Permits (2026)
Key Facts
- Governing section
- Town Code § 16-3A
- Permit issuer
- Chief Building Inspector
- Shed exemption
- Detached, one-story, under 144 sq ft
- Permit expiration
- 12 months, extendable to 24
- Maximum penalty for no permit
- $125/day, up to 15 days, or both
Summary
Town Code § 16-3A requires a building permit for any work that must conform to the Uniform Code or Energy Code, including construction, alteration, or demolition, before work can start, with narrow exemptions such as small sheds under 144 square feet and simple finish work.
Building permits required. Except as otherwise provided in this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation, or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney, or flue in any dwelling unit. No person shall commence any work for which a building permit is required without first having obtained a building permit from the Town.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4966897; v79 updated 2026-05-28; through 05-28-2026).
Full Breakdown
Section 16-3A states the core rule plainly: except as otherwise provided, a building permit is required for any work that must conform to the Uniform Code and/or the Energy Code, including but not limited to construction, enlargement, alteration, improvement, removal, relocation or demolition of a building or structure, and installation of a solid-fuel-burning heating appliance, chimney or flue in a dwelling unit. No one may commence work requiring a permit without first obtaining one from the Town. The section then lists specific exemptions: one-story detached accessory structures on one- or two-family or townhouse lots used as tool or storage sheds, playhouses or similar uses, so long as gross floor area does not exceed 144 square feet and the structure sits in a conforming location under Chapter 85 (the Town's zoning code); window awnings on one- or two-family dwellings, again if conforming under Chapter 85; painting, wallpapering, tiling, carpeting or similar finish work; installation of listed portable electrical, plumbing, heating, ventilation or cooling equipment; and repairs that do not affect the structural system, required means of egress, or fire protection system.
Subsection B is explicit that an exemption from needing a permit is not authorization to do noncompliant work; the underlying Uniform Code and Energy Code requirements still apply. Permits are applied for in writing to the Chief Building Inspector under § 16-3C, and under § 16-3H a building permit expires 12 months after issuance, extendable up to 24 months at the Inspector's discretion, with defined one-year renewal windows and escalating fees for exterior work left unfinished.
Violations & Fines
Starting or continuing permit-required work without a permit is enforced under § 16-8C as a violation of Chapter 16: a fine of up to $125 per day of violation, up to 15 days' imprisonment, or both, plus a civil penalty of up to $125 per day the Town can pursue in court, and the Chief Building Inspector may issue a stop-work order or appearance ticket.
Frequently Asked Questions
Do I need a permit to build a shed in the Town of Brookhaven?
Is painting or wallpapering my house exempt from a Brookhaven building permit?
How long does a Brookhaven building permit last?
Sources & Official References
Other rules in Brookhaven
New York rules heatmap·Compare Brookhaven to another location·View the New York building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Suffolk County handle building permits.