Skip to main content
CityRuleLookup

Huntington, NY Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing agency
Dept. of Engineering Services
Governing section
Town Code § 87-14
Residential minimum fee
$125 + $50 application fee
Permit expiration
One year from issuance
Work before permit
Fee tripled (§ 87-23.F)

Summary

In the Town of Huntington, no one may construct, install, alter, repair, move, or demolish a building or structure without a building permit issued by the Department of Engineering Services. Ordinary repairs and detached sheds under 144 square feet are exempt.

§ 87-14. Permit required; exemptions. A. It shall be unlawful to construct, install, alter, repair, modify, remove or demolish, or to cause the construction, installation, alteration, repair, modification, removal or demolition of a building or structure; or to own, maintain or operate a building or structure which has been constructed, installed, altered, repaired, modified, removed, or demolished, in whole or in part, without a building permit having been issued by the Department of Engineering Services.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4940543; v75 updated 2026-06-09; through 06-09-2026).

Full Breakdown

Town Code § 87-14(A) makes it unlawful to construct, install, alter, repair, modify, remove, or demolish any building or structure without a building permit issued by Huntington's Department of Engineering Services, Division of Building and Housing. Applications require a notarized owner affidavit, plans in triplicate, and a $50 non-refundable application fee plus a minimum fee of $125 residential or $625 non-residential (§ 87-23). Permits expire one year after issuance and may be renewed for up to two more years (§§ 87-21, 87-22). Exemptions cover ordinary repairs and detached sheds or greenhouses under 144 square feet. Starting work before a permit issues triples the fee (§ 87-23.F).

Violations & Fines

Building without a permit is a Chapter 87 violation: the Town issues a stop-work order and triples the permit fee under § 87-23.F, and the Director of Engineering Services may revoke any permit (§ 87-24).

Frequently Asked Questions

Do I need a permit for a backyard shed in Huntington?
Not for a detached shed or greenhouse serving a one- or two-family home under 144 square feet and 12.5 feet high, with no more than two such structures on the lot (§ 87-14.D).
How long is a Huntington building permit valid?
One year from issuance. It may be renewed by the Department of Engineering Services for up to two additional one-year terms (§§ 87-21, 87-22).
What happens if I start construction before getting a permit?
The building permit fee is tripled under § 87-23.F, and the Town may issue a stop-work order for the unlawful construction under Chapter 87.

Sources & Official References

Other rules in Huntington

All Huntington rules

New York rules heatmap·Compare Huntington to another location·View the New York building safety overview

Get notified when Building Permits in Huntington, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Suffolk County handle building permits.

Islip, NY
Some Restrictions
Babylon, NY
Some Restrictions