Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Commercial/mixed-use projects of 4,000+ sq ft
Required rating
Minimum LEED "Certified"
Deposit fee
$1/sq ft, capped at $200,000
Certification deadline
25 months after certificate of occupancy
Enforcing officials
Green Building Compliance Officials
Citation
Huntington Code § 197-4

Summary

Commercial and mixed-use construction or major renovation of 4,000 square feet or more in Huntington must achieve a minimum LEED "Certified" rating under Town Code Chapter 197. Applicants register with the U.S. Green Building Council, submit a Green Building Project Checklist, and post a refundable deposit of $1 per square foot, capped at $200,000, before a building permit issues.

Standards for Compliance for Covered Projects: All covered projects shall meet a minimum LEED™ "Certified" rating. In order to meet the minimum LEED™ "Certified" rating the following requirements shall be fulfilled by the applicant: 1. LEED™ Registration and Certification: The applicant shall register the covered projects with the U.S. Green Building Council and shall obtain LEED™ certification through the U.S. Green Building Council as required under this Chapter. 2. Building Commissioning: Building commissioning by the US Green Building Council is required under this Chapter. Applicants must verify that fundamental building systems are designed, installed, and calibrated to operate as intended.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4940543; v75 updated 2026-06-09; through 06-09-2026).

Full Breakdown

Chapter 197, adopted in 2008 and amended by Local Law No. 23-2026, defines a "Covered Project" as new construction of a commercial or mixed-use building, or a major renovation of one, that reaches 4,000 square feet of gross floor area. S. Green Building Council, obtains LEED certification, and completes building commissioning to verify core systems are installed and calibrated as designed. Before the first building permit is issued, the applicant submits pre-permitting documentation, the Green Building Project Checklist and Green Building Worksheet, to the Green Building Compliance Officials (the Director of Planning and Environment and the Director of Engineering Services).

10-per-square-foot training fee. Proof of certification is due within twenty-five months of the certificate of occupancy or the entire deposit is forfeited. During construction, Building Division staff verify that approved green measures are being installed, and noncompliance can trigger a stop-work order under § 87-44. Historic structures, non-covered projects, and Town-sponsored projects under 4,000 square feet are exempt, and an applicant who shows hardship or infeasibility may apply for a reduced credit target. A denial of an exemption or a noncompliance finding can be appealed to an administrative hearing officer, whose written decision is subject to judicial review under Article 78 of the CPLR.

Violations & Fines

Failing to submit LEED certification proof within twenty-five months of the certificate of occupancy forfeits the entire per-square-foot deposit, up to $200,000, to the Town. Noncompliance discovered during construction can bring a stop-work order under § 87-44, covering the whole project or just the noncompliant portion until the Green Building Compliance Officials confirm the work is back in line with the approved documentation.

Frequently Asked Questions

Which Huntington construction projects must meet the green building code?
Any covered project, meaning new construction of a commercial or mixed-use building, or a major renovation of one, that reaches 4,000 square feet of gross floor area. Town-sponsored projects under 4,000 square feet, historic structures, and projects already fully designed before the law's effective date are exempt from the LEED requirement.
What LEED level does Huntington require?
A minimum LEED "Certified" rating from the U.S. Green Building Council, verified through a Green Building Project Checklist and Worksheet submitted to the Green Building Compliance Officials before the first building permit is issued, plus building commissioning confirming that core systems perform as designed.
What happens to the green building deposit if a project isn't certified?
The applicant's deposit of $1 per square foot, capped at $200,000, is forfeited in full if proof of LEED "Certified" status isn't submitted to the Building Department within twenty-five months of the certificate of occupancy, and the money is transferred to the Town's green energy or training accounts.
Can a project be excused from the LEED requirement?
Yes, an applicant may apply for a hardship or infeasibility exemption when submitting pre-permitting documentation, showing why full compliance isn't practical. The Green Building Compliance Officials set a reduced, maximum-feasible credit target instead, and a denial can be appealed to an administrative hearing officer and then to the courts.

Sources & Official References

Other rules in Huntington

All Huntington rules

New York rules heatmap·Compare Huntington to another location·View the New York building safety overview

Get notified when Green Building Code in Huntington, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.