DuPage County, IL Building Safety: Building Permits (2026)
Key Facts
- Governing section
- Sec. 8-112.1, County Building Code
- Applies to
- Unincorporated DuPage County only
- Covers equipment installs
- Water heaters, furnaces, AC, EV chargers
- Permit expires unused
- 180 days, then void
- Key exemptions
- Ordinary repairs, single reroof overlay
Summary
Unincorporated DuPage County requires a permit before you build, alter, demolish, or install most fixed equipment, including water heaters, furnaces, AC units, heat pumps, and EV chargers.
It shall be unlawful to change the occupancy of, construct, add to, alter, relocate, remove or demolish a building or structure, or excavate and or fill any tract of land, or to commence the construction, addition, alteration, relocation, residing, re-roofing, removal or demolition of a building or structure or install equipment ... including, but not limited to, water heaters, furnaces, air conditioning equipment, heat pumps, EV charging stations ... without first filing with the Building Official an application in writing and obtaining a formal permit.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 14 Update 1).
Full Breakdown
Under Sec. 8-112.1 of the County Building Code, it is unlawful to construct, add to, alter, relocate, remove, or demolish a building or structure, or to install equipment like water heaters, furnaces, HVAC systems, heat pumps, or EV charging stations, without first filing a written application with the Building Official and obtaining a formal permit. The permit duty covers structures broadly: accessory buildings, decks, patios, pools, hot tubs, arbors, sidewalks, fences, and signs are all named as "structures" subject to the requirement. Only the narrow exemptions in Sec. 8-101.2 (ordinary repairs/maintenance, single-overlay reroofing, qualifying agricultural buildings, and certain nonconforming structures left unchanged) fall outside it. A permit issued but unused for 180 days becomes void and requires a new amendment permit before work can start or resume.
Violations & Fines
Work performed without the required permit is a Code violation subject to the penalties in Sec. 8-117.4; the Building Official can also revoke a permit obtained through a false statement or misrepresentation.
Frequently Asked Questions
Does re-roofing my house need a permit?
Do I need a permit to install an EV charger?
What happens if my permit sits unused too long?
Sources & Official References
Other rules in DuPage County
Compare DuPage County to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.