Skip to main content
CityRuleLookup

Federal Way, WA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code adopted
2021 International Building Code (FWRC 13.16.020)
Critical-area work
Permit always required, no exemptions apply
Shed exemption
200 sq ft or less, 10 ft wall height max
Amended-permit fee
Set by city fee resolution
Appeal deadline
14 days to hearing examiner
Max penalty
$1,000 fine and/or 90 days jail

Summary

Federal Way requires a building permit for construction work under the adopted 2021 International Building Code, and FWRC 13.16.030 tightens the standard IBC exemptions: work inside a mapped critical area always needs a permit, and only small detached accessory structures under 200 square feet and 10 feet of wall height skip the permit step.

IBC Section 105.1.1, Annual permit, is hereby replaced with IBC Section 105.1.1, Work in Critical Areas, to read as follows: Permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall be required for work proposed within critical areas. Work exempt from permit (IBC Section 105.2) shall not apply to work proposed in critical areas. ... IBC Section 105.2, item 1, is hereby amended to read as follows: One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 200 square feet (18.58 m2) and exterior wall height shall not exceed 10 feet measured from the bottom plate to the top of wall.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 26-1049, passed August 11, 2026).

Full Breakdown

030 amends several of its permit provisions. 2 do not apply there. 2, item 1 so that a one-story tool shed, storage shed, playhouse, or similar structure is exempt from a permit only if its floor area is 200 square feet or less and its exterior wall height does not exceed 10 feet from bottom plate to top of wall; anything larger needs a permit like any other structure. The chapter also creates a formal amended-permit process at subsection (7): if the scope or size of an already-permitted project changes, the applicant must file for an amended permit, submit updated plans and calculations, and pay a review fee under the city's fee resolution before the building official issues the amendment.

080, and an appellant must file within 14 days and pay the appeal fee set on the city's fee schedule, refundable if the appeal succeeds.

Violations & Fines

Building without the required permit, or performing critical-area work under the mistaken belief that the IBC's standard exemptions apply, is enforced under the FWRC 1.10.010 general penalty: a misdemeanor punishable by up to a $1,000 fine, up to 90 days in jail, or both, with each day of unpermitted construction charged as a separate violation the building official can refer for civil abatement under Chapter 1.15 FWRC.

Frequently Asked Questions

When can I build a shed in Federal Way without a permit?
Only if it is a one-story detached tool shed, storage shed, playhouse, or similar structure with a floor area of 200 square feet or less and exterior wall height no greater than 10 feet, per FWRC 13.16.030(6). Anything bigger, or any structure on a mapped critical area, needs a full building permit.
Do I need a permit to work in a critical area?
Yes, always. FWRC 13.16.030(4) rewrites the IBC's critical-areas rule so that none of the code's standard permit exemptions apply once work is proposed within a mapped critical area; a permit is required regardless of the project's size or type.
What if my project changes after the permit is issued?
You must file for an amended permit under FWRC 13.16.030(7), submitting updated plans, calculations, and other documents describing the change, and pay a review fee set by the city's fee resolution before the building official approves the larger or altered scope of work.

Sources & Official References

Other rules in Federal Way

All Federal Way rules

Compare Federal Way to another location·View the Washington building safety overview

Get notified when Building Permits in Federal Way, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in King County handle building permits.

Renton, WA
Some Restrictions
Seattle, WA
Some Restrictions
Kent, WA
Some Restrictions
Auburn, WA
Some Restrictions
Bellevue, WA
Some Restrictions