Haverford, PA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit trigger
Erecting, altering, enlarging, moving, or changing use of a building
Issued with
The required building permit, simultaneously
Decision deadline
30 days after application
Expiration
Six months without substantial commencement of work
Building code
Uniform Construction Code adopted by § 58-1
Zoning violation fine
Not exceeding $600 plus costs

Summary

Haverford Township requires a zoning permit before any building or structure is erected, structurally altered or enlarged, before a use or occupancy changes, and before a building is moved. The zoning permit is issued simultaneously with the required building permit. Permits lapse after six months without substantial work.

A. Requirements for zoning permits. A zoning permit shall be required prior to the erection, construction, structural alteration or enlargement of any building, structure or any portion thereof, including any sign; prior to the use or change in use or occupancy of a building or land; prior to the moving of a building into the Township or from one place in the Township to another; and prior to the change or extension of a nonconforming use. Such permit shall be issued simultaneously with the required building permit. ... D. Expiration of permits. No permit for the erection, razing, change, alteration or removal of buildings shall be valid or effective after six months from the date of issuance thereof and shall thereafter be void, unless the work authorized by such permit shall have been substantially commenced within six months from the date of issuance and proceeded with, with due diligence.

Full Breakdown

Building permits in Haverford Township sit on two layers. Under § 58-1, the Uniform Construction Code, contained in 34 Pa. Code, Chapters 401 through 405, as amended from time to time, is adopted by reference as the municipal building code of Haverford Township. Section 182-902A of the Zoning chapter then sets the trigger: a zoning permit is required prior to the erection, construction, structural alteration or enlargement of any building, structure or any portion thereof, including any sign; prior to the use or change in use or occupancy of a building or land; prior to the moving of a building into the Township or from one place in the Township to another; and prior to the change or extension of a nonconforming use. That permit is issued simultaneously with the required building permit.

Applications go in writing to the Zoning Officer on Township forms, with building and plot plans in duplicate. Under § 182-902B no zoning permit is complete or permanently effective until the Zoning Officer certifies that the work meets the chapter and any other applicable code or ordinance. Under § 182-902C, permits are granted or refused within 30 days after the date of application, and a refused applicant is told of the right to appeal to the Zoning Hearing Board.

Expiration is strict. Under § 182-902D, no permit for the erection, razing, change, alteration or removal of buildings is valid after six months from issuance unless the work has substantially commenced within six months and proceeds with due diligence. A permit delayed by reasonable cause not due to the applicant's own negligence can be renewed without additional cost.

On completion, § 182-902E requires notice to the Zoning Officer and a certificate of occupancy before the building is occupied or the lot used, granted or denied within 30 days of application. Fees follow the schedule adopted by resolution of the Board of Commissioners under § 182-903. Section 58-2A separately requires a certificate of occupancy before any dwelling or nonresidential property is used, occupied or conveyed.

Violations & Fines

Under § 182-901H, a person, firm or corporation violating the zoning chapter pays a judgment not exceeding $600 and costs of prosecution, including attorney's fees, on conviction before a District Justice, and each day is a separate offense. Under § 182-901G, the Board of Commissioners can also start an action to restrain or abate work done in violation.

Frequently Asked Questions

Do I need a permit to build an addition in Haverford Township?
Yes. Section 182-902A requires a zoning permit before the erection, construction, structural alteration or enlargement of any building or structure, and it is issued simultaneously with the required building permit. Building standards come from the Uniform Construction Code adopted in § 58-1.
How long does Haverford Township have to decide on my permit?
Section 182-902C requires permits to be granted or refused within 30 days after the date of application. If the Zoning Officer refuses, the applicant must be told of the right to appeal to the Zoning Hearing Board.
When does a permit expire?
Under § 182-902D, a permit is void six months after issuance unless the authorized work has been substantially commenced within that time and proceeded with due diligence. A delay from reasonable cause not due to the applicant's negligence allows renewal without additional cost.
Is a certificate of occupancy required?
Yes. Section 182-902E bars occupying a building or using a lot until the Zoning Officer issues a certificate of occupancy after inspection, and the decision comes within 30 days of application. Section 58-2A also requires one before a property is used, occupied or conveyed.

Sources & Official References

Other rules in Haverford

All Haverford rules

Compare Haverford to another location·View the Pennsylvania building safety overview

Get notified when Building Permits in Haverford, PA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.