Madera, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code adopted
2022 California Building Code
Enforcing office
Dept. of Building and Safety
Fee basis
Set by City Council resolution
Unpermitted work
Investigation fee applies regardless
Conflict rule
Most restrictive/safest code prevails

Summary

Madera adopts the 2022 California Building Code by reference and requires a permit for erection, construction, enlargement, alteration, repair, moving, demolition and change of occupancy of buildings. The Building Official sets valuation and fees.

Notwithstanding the forgoing, including Section 109.2 of Division II Scope and Administration, of the California Building Code 2022 edition, fees for permits, plan review, investigation, and re-inspection shall be as follows: ... An investigation fee in addition to the permit fee shall be collected whether or not a permit is then or subsequently issued. ... the 2022 California Building Code (CBC), excluding Chapter 29 Plumbing systems, and including Appendix P Emergency Housing, as promulgated by the California Building Standards Commission which incorporates the 2021 edition of the International Building Code with California amendments, is hereby adopted by reference thereto as if fully set forth in this chapter

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2024 S-50: Current through Ordinance 1010 C.S., passed 6-5-24).

Full Breakdown

02, the city adopts the 2022 California Building Code (CBC), based on the 2021 International Building Code, to regulate the erection, construction, enlargement, alteration, repair, moving, removal, conversion, demolition, occupancy, equipment, use, height, area, and maintenance of buildings and structures in the city, excluding Chapter 29 Plumbing Systems but including Appendix P Emergency Housing. 2 of the CBC, permit fees, plan review fees, investigation fees and re-inspection fees are set separately by resolution of the City Council. The Building Official, who is the Director of the Department of Building and Safety or a designee, determines the value of construction work used to compute permit and plan review fees, and that valuation covers all finished work including painting, roofing, electrical, plumbing, heating, air conditioning, elevators and fire extinguishing systems, whether the materials were donated, purchased or self-provided.

An investigation fee applies whenever work begins without a permit, whether or not a permit is later issued, and paying it does not excuse compliance with the code or exempt the violator from other penalties. Where this code conflicts with another city, state or federal code, the Building Official applies whichever provision gives the highest level of safety. , passed May 3, 2023, to bring the local code current to the 2022 CBC cycle.

Violations & Fines

Constructing, altering or demolishing a structure without the required permit exposes the owner or contractor to an investigation fee in addition to the standard permit fee, assessed whether or not a permit is ultimately issued. Enforcement runs through the Department of Building and Safety, and unpermitted work must still meet every substantive requirement of the adopted CBC; the investigation fee does not excuse the violator from any other penalty prescribed by law.

Frequently Asked Questions

Which building code applies in Madera?
The 2022 California Building Code, based on the 2021 International Building Code, adopted by reference under Madera Municipal Code § 9-1.02, excluding its Chapter 29 on plumbing systems but including Appendix P for emergency housing.
Who decides the value of my project for permit fees?
The Building Official, the Director of the Department of Building and Safety or a designee, determines the total valuation of all construction work, including finished materials and systems, under § 9-1.01(A), and that figure sets the permit and plan review fees.
What happens if I start work without a permit?
The city can charge an investigation fee under § 9-1.01(C) in addition to the regular permit fee, whether or not a permit is later issued, and paying it does not excuse the work from meeting code or from any other penalty.

Sources & Official References

Other rules in Madera

All Madera rules

California rules heatmap·Compare Madera to another location·View the California building safety overview

Get notified when Building Permits in Madera, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.