Pasadena, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit required for
Erecting, altering, repairing, demolishing regulated structures
Shed exemption
One-story shed under 120 sq ft, 24-in. roof
Platform exemption
Height 30 in. or less above grade
Grading threshold
Permit needed above 50 cubic yards
Permit expires
24 mo. (SFR/duplex), 36 mo. (other)
Max extensions
Two, 6 months each, 2% valuation fee
Max penalty
$1,000 fine and/or 6 months jail

Summary

Pasadena requires a separate building permit from the Building Official before erecting, altering, repairing, moving, or demolishing any structure or building service equipment regulated by the city's code, per Municipal Code Section 14.03.060.A. A handful of small projects are exempt, including detached sheds under 120 square feet, low platforms and walks, and movable counters under 5 feet 9 inches, but grading over 50 cubic yards always needs a permit.

A.Required: Except as specified in this code, no building, structure or building service equipment regulated by this code shall be erected, constructed, enlarged, altered, repaired, moved, installed, improved, removed, converted or demolished unless a separate, appropriate application has been made and permit for each building, structure or building service equipment has first been obtained from the building official. No grading shall occur without the prior procurement of a grading permit or as authorized by the building official. Unless otherwise exempted, separate plumbing, electrical, and mechanical permits will be required for actions and installations that are regulated by this code.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 79 Update 2).

Full Breakdown

Section 14.03.060.A sets the baseline rule: no building, structure, or building service equipment regulated by the code shall be 'erected, constructed, enlarged, altered, repaired, moved, installed, improved, removed, converted or demolished' without a separate permit obtained from the Building Official, and no grading may occur without a grading permit. Unless specifically exempted, plumbing, electrical, and mechanical work each need their own separate permit on top of the building permit.

Section 14.03.060.B lists narrow carve-outs. A one-story detached accessory building, such as a tool shed or playhouse, is exempt only if the combined roof area of all such structures on the lot stays under 120 square feet and the roof does not project more than 24 inches, and any electrical, plumbing, or solar work tied to that shed still needs its own permit. Platforms, walks, and driveways no more than 30 inches above grade are exempt unless they sit in a front setback or serve as part of an accessible route. Grading of 50 cubic yards or less does not need a grading permit unless Chapter 14.05 says otherwise.

Applications are reviewed by the Building Official under Section 14.03.070, and every permit expires under Section 14.03.080 if work is not finished within 24 months for a single-family or duplex project, or 36 months for multi-family and non-residential work, counted from the date of issuance; the Building Official can grant up to two six-month extensions for a fee equal to 2% of project valuation or $1,000, whichever is greater.

Violations & Fines

Section 14.03.100.E requires an investigation fee equal to the permit fee whenever work begins without one, on top of the permit fee itself once the project is legalized. Section 14.03.050 makes any violation of the Building Standards Administrative Code a misdemeanor, punishable by a fine of up to $1,000, up to six months in jail, or both, with each day of continued violation charged separately.

Frequently Asked Questions

Do I need a permit to build a storage shed in my Pasadena backyard?
Not if it's a one-story detached shed used for tools, storage, or as a playhouse, with a combined roof area of all such structures under 120 square feet and no more than a 24-inch roof overhang. Any electrical, plumbing, or solar work connected to the shed still needs its own permit under Section 14.03.060.B.1.a.
How much grading can I do in Pasadena without a permit?
Up to 50 cubic yards, under Section 14.03.060.B.5, unless a different threshold applies under Chapter 14.05 or Section J103.2 of the California Building Code. Anything beyond that needs a grading permit from the Building Official before work starts.
How long do I have to finish work under a Pasadena building permit?
Section 14.03.080 gives single-family and duplex projects 24 months and multi-family or non-residential projects 36 months from the date of issuance. You can request up to two six-month extensions, each requiring a fee equal to 2% of the project's valuation or $1,000, whichever is greater.

Sources & Official References

Other rules in Pasadena

All Pasadena rules

California rules heatmap·Compare Pasadena to another location·View the California building safety overview

Get notified when Building Permits in Pasadena, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Los Angeles County handle building permits.

Downey, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions