Pasadena, CA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing section
PMC § 14.03.060
Adopted code
2025 California Electrical Code
Adoption date
Nov. 10, 2025 (Ord. No. 7461)
Electrical exemption
only CEC Article 89 activities
Application expires
1 year if no permit issued
Misdemeanor penalty
up to $1,000 / 6 months, per day
Emergency repairs
permit due next business day

Summary

Pasadena requires a separate permit from the building official before any electrical work regulated by the adopted California Electrical Code proceeds, under Section 14.03.060 of the Building Code and Related Codes chapter. The city adopts the 2025 California Electrical Code by reference at Section 14.04.010, and only activities exempted under California Electrical Code Article 89 skip the local permit.

A.Required: Except as specified in this code, no building, structure or building service equipment regulated by this code shall be erected, constructed, enlarged, altered, repaired, moved, installed, improved, removed, converted or demolished unless a separate, appropriate application has been made and permit for each building, structure or building service equipment has first been obtained from the building official. No grading shall occur without the prior procurement of a grading permit or as authorized by the building official. Unless otherwise exempted, separate plumbing, electrical, and mechanical permits will be required for actions and installations that are regulated by this code... 2.Electrical Permits: An electrical permit shall not be required for exempted activities in accordance with California Electrical Code Article 89.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 79 Update 2).

Full Breakdown

060(A) requires a separate, appropriate permit application to the building official before any building, structure or building service equipment regulated by the code, including electrical work, is erected, altered, repaired, moved, installed, improved or removed, and states plainly that 'separate plumbing, electrical, and mechanical permits will be required for actions and installations that are regulated by this code' unless otherwise exempted. 060(B)(2) narrows the electrical exemption to only those activities exempted under California Electrical Code Article 89, meaning nearly all wiring, service and fixture work in the city needs a permit and inspection.

010 by Ordinance No. 7461 on November 10, 2025; a copy is kept on file with the city for public inspection. 060(H), and an application expires if no permit issues within one year. 060(C): the repair may proceed immediately, but a complete permit application must be submitted by the next business day. 070, ties new-construction compliance to the same adopted California Electrical Code.

Violations & Fines

Section 14.03.050 makes it unlawful to construct, alter, repair, move, convert or demolish any building, structure or building service equipment, including electrical installations, in violation of the code's permit requirements. Each day a violation continues counts as a separate offense, and a conviction is a misdemeanor punishable by a fine of up to $1,000, up to six months in jail, or both. The city may also pursue the administrative proceedings set out in Title 1 of the code in addition to that criminal penalty.

Frequently Asked Questions

Do I need a permit to rewire an outlet in Pasadena?
Yes, in almost every case. Section 14.03.060(A) requires a separate electrical permit for any electrical work regulated by the adopted California Electrical Code, and Section 14.03.060(B)(2) limits the exemption to only the narrow activities exempted under California Electrical Code Article 89.
What electrical code does Pasadena enforce?
The 2025 California Electrical Code with Annexes A, C and I, adopted at Section 14.04.010 along with the rest of the California Building Standards Code, Title 24 of the California Code of Regulations. A copy is on file with the city for public inspection.
Can I fix an electrical emergency before getting a permit?
Yes. Section 14.03.060(C) allows emergency equipment replacement and repairs to be performed immediately, but a complete permit application must be submitted to the building official by the next working business day after the emergency work begins.
What's the penalty for doing electrical work without a permit?
Section 14.03.050 makes unpermitted work a misdemeanor punishable by a fine of up to $1,000, up to six months in jail, or both, and treats each day the violation continues as a separate offense, so an ongoing unpermitted installation can accumulate multiple counts.

Sources & Official References

Other rules in Pasadena

All Pasadena rules

California rules heatmap·Compare Pasadena to another location·View the California building safety overview

Get notified when Electrical Permits in Pasadena, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Los Angeles County handle electrical permits.

Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Los Angeles, CA
Some Restrictions
Compton, CA
Some Restrictions
Lancaster, CA
Some Restrictions
Palmdale, CA
Some Restrictions