Plainfield, NJ Building Safety: Building Permits (2026)
Key Facts
- Development permit issuer
- Zoning Officer (§ 17:8-1)
- Construction code
- State Uniform Construction Code, Building Subcode (§ 6:1-1)
- New construction fee
- $0.0395 per cubic foot, $75 minimum
- Plan review fee
- 25% of the construction permit fee
- Shed fee, R-5 up to 600 sq. ft.
- $80
- Appeal deadline
- 15 days to Union County Board of Construction Appeals
- Plans required
- Three sets of plot plans, floor plans, elevations
Summary
In the City of Plainfield, New Jersey, no structure can be erected, enlarged, altered or demolished, and no land altered, filled or used, until the Zoning Officer grants a development permit under § 17:8-1. That permit is the prior approval for the construction permit under the Uniform Construction Code.
A. Development Permit: 1. It is the intent of this chapter to utilize a development permit even if a construction permit or approving authority action may not be required but where regulatory oversight is necessary to insure proper and safe installation of site elements such as fences, swimming pools, sheds and other site elements or structures as seen fit by the Zoning Officer. A development permit is considered a prior approval for issuance of a construction permit under the regulations of the Uniform Construction Code. The issuance of a construction permit or certificate of occupancy shall be deemed to require the issuance of a development permit. 2. No structure or part thereof shall be erected, raised, moved, extended, enlarged, altered, or demolished and no land shall be altered, filled or used unless and until a development permit has been granted by the Zoning Officer.
Full Breakdown
Plainfield uses two permits in sequence. The first is the development permit issued by the Zoning Officer under § 17:8-1(A) of the Municipal Code. It applies even where a construction permit or approving authority action is not required, so the Zoning Officer can oversee fences, swimming pools, sheds and other site elements. The code says a development permit is a prior approval for issuance of a construction permit, and that issuing a construction permit or certificate of occupancy is deemed to require a development permit. The second is the construction permit under the State Uniform Construction Code, Building Subcode, which § 6:1-1 adopts. The Division of Building and Construction administers it through the Construction Official (§ 2:10-5).
Application requirements are specific. For a new structure or addition, the applicant files three sets of plot plans, building floor plans and architectural elevations, signed and sealed by a New Jersey licensed professional, except that the owner of a single family dwelling can prepare and sign the plans and file an affidavit. No development permit issues until final approval by the appropriate approving authority, and a variance needs a written order first. The City Engineer reviews grading and drainage before issuance. Where a Certificate of Appropriateness is required under Article X, it comes first.
Construction permit fees are printed in § 2:10-6C. New construction is $0.0395 per cubic foot with a $75 minimum. Renovations, alterations, repairs, re-roofing and re-siding are $24 per $1,000 of estimated cost up to $50,000, then $18 per $1,000 from $50,001 to $100,000 and $17 per $1,000 above $100,000. A shed or accessory structure to an R-5 up to 600 square feet is $80, and over 600 square feet is $150. An above ground pool is $75 and an inground pool $250. Plan review is 25 percent of the permit fee, and renewal is 10 percent of the original fee with a $75 minimum. The Construction Official makes the final decision on estimated cost. Appeals of enforcing agency decisions go to the Union County Board of Construction Appeals within 15 days (§ 2:10-6B).
Violations & Fines
Building or using land before obtaining a development permit is a violation under § 17:1-22. Under § 17:1-23 the penalty is not more than $1,500 for the first ten days after the initial summons and not more than $75 per day after that, set by the court. The Zoning Officer can issue a stop work order at any time (§ 17:1-20).
Frequently Asked Questions
Do I need a permit to build a fence or shed in Plainfield?
Who issues building permits in the City of Plainfield?
What does a Plainfield building permit cost?
What if I start work in Plainfield before getting the permit?
How do I appeal a construction code decision in Plainfield?
Sources & Official References
Other rules in Plainfield
Compare Plainfield to another location·View the New Jersey building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Union County handle building permits.