Skip to main content
CityRuleLookup

Puyallup, WA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted codes
IBC, IRC, IMC, IFGC, UPC, NEC, IPMC
Deck permit exemption
30 inches or less above grade
Application expires
180 days without permit issuance
Permit void
2 years from issuance regardless
Standard violation
Class 1 civil infraction
Appeals body
City hearing examiner

Summary

Puyallup governs building permits through the state-adopted International Building Code and Residential Code, enforced by the city's building official. Permits expire if work is not begun within 180 days or not finished within two years.

The city of Puyallup hereby adopts the following codes by reference, which are incorporated herein, as they currently exist or are hereafter amended: (1) The current edition of the International Building Code, published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-50 WAC. ... (2) The current edition of the International Residential Code, published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-51 WAC.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4985225; v6 updated 2026-07-21; through 07-21-2026).

Full Breakdown

030 adopts the current International Building Code and International Residential Code by reference, as the Washington State Building Code Council has incorporated them into WAC 51-50 and WAC 51-51, along with the International Mechanical Code, International Fuel Gas Code, Uniform Plumbing Code, National Electric Code and the 2012 International Property Maintenance Code. 2 so that decks not more than 30 inches above adjacent grade, and not over a basement or story, are exempt from a permit. 080). Applications expire after 180 days without a permit unless the applicant is pursuing one in good faith, and the building official can grant extensions of up to 90 days at a time. 120). 140). 110).

Violations & Fines

Violating any provision of Chapter 17.04 or the codes it adopts, including building, altering or occupying a structure contrary to those codes, is a Class 1 civil infraction under PMC § 17.04.130 and Chapter 1.02 PMC. Violating a stop work order, a notice of violation, or using unsafe structures or equipment after notice escalates to a misdemeanor. The violator is liable for all costs the violation causes, and the city may revoke the permit or approval involved.

Frequently Asked Questions

Do I need a permit to build a deck in Puyallup?
Only if it rises more than 30 inches above adjacent grade or sits over a basement or story. PMC § 17.04.050(2) amends IRC Section R105.2 to exempt lower decks from a building permit; taller decks still need one from the building official.
How long is a Puyallup building permit valid?
Work must begin within 180 days of issuance or the permit expires, and it becomes void two years after issuance even if the work is unfinished, under PMC § 17.04.120. The building official can grant extensions of up to 90 days at a time on written request.
What building code edition does Puyallup use?
The current editions of the International Building Code and International Residential Code, as adopted by the Washington State Building Code Council in WAC 51-50 and 51-51 respectively, per PMC § 17.04.030(1)-(2), with local amendments layered on top.
What happens if I build without a required permit in Puyallup?
It is unlawful under PMC § 17.04.130 and is treated as a Class 1 civil infraction under Chapter 1.02 PMC. If a stop work order or notice of violation is ignored, the offense becomes a misdemeanor and the city can revoke any permit involved.

Sources & Official References

Other rules in Puyallup

All Puyallup rules

Compare Puyallup to another location·View the Washington building safety overview

Get notified when Building Permits in Puyallup, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in this county handle building permits.

Lakewood, WA
Some Restrictions
Tacoma, WA
Some Restrictions