Key Facts

Governing framework
NJ Uniform Construction Code, N.J.A.C. 5:23-1
Stormwater trigger
200+ sq ft new impervious surface
Flood hazard condition
Chapter 154 and § 190-120 compliance
Permit folds in
Zoning permit requirement
Enforcing officials
Zoning Officer; Village Engineer
Violation class
Misdemeanor, separate daily offense

Summary

The Village of Ridgewood requires a building permit before any construction that must conform to the zoning code, and bars issuance until plans show compliance, site plan/subdivision approval is complete, and stormwater plans are approved for projects adding 200+ square feet of impervious surface. Chapter 190 sets the conditions.

Building permits. Building permits shall be required and shall be administered in accordance with the requirements of the New Jersey Uniform Construction Code, N.J.A.C. 5:23-1 et seq., adopted pursuant to the State Uniform Construction Code Act, N.J.S.A. 52:27D-119 et seq. ... No building permit shall be issued unless and until the plans and intended uses therefor indicate that such building or structure is designed to conform in all respects to the provisions of this chapter and all other applicable ordinances of the Village or it is demonstrated that such building or structure is legally nonconforming or is the subject of a valid and current variance. ... Prior to the issuance of a building permit for any development involving an increase of at least 200 square feet of impervious surface area, the applicant shall be required to submit to and obtain approval of a site grading and stormwater control plan by the Village Engineering Department, Planning Board or Board of Adjustment, as applicable, in accordance with §§ 190-83 and 190-120A.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4854397; v35 updated 2026-04-22; through 04-22-2026).

Full Breakdown

C. , but layers on village-specific conditions. No building permit may be issued unless the plans and intended use show the building or structure is designed to conform in all respects to Chapter 190 and other applicable Village ordinances, or unless it is shown to be legally nonconforming or covered by a valid variance. Before a building permit issues for any development adding at least 200 square feet of impervious surface area, the applicant must first submit and obtain approval of a site grading and stormwater control plan from the Village Engineering Department, Planning Board or Board of Adjustment.

No building permit may be issued for a building or structure in a flood hazard area unless Chapter 154 and § 190-120 are satisfied, absent nonconforming status or a variance. No permit may issue for any development requiring site plan or subdivision approval until Article VII's requirements are met, and even exempt improvements need Village Engineer or Village Planner certification of design-standard compliance under Article IX. Issuing a building permit folds in all required zoning permits, eliminating the need for a separate zoning permit and superseding any zoning permit previously issued for the same structure. Enforcement of Articles VII, IX, X, XI and XIII, including building permit compliance, falls to the Zoning Officer and the Village Engineer/Public Works Director.

Violations & Fines

Using or occupying land or a building without the required building, zoning or other permit, when one is required, is a direct violation of Chapter 190 under § 190-97D. Violators are guilty of a separate misdemeanor under § 190-136 and are liable for the penalty set in Chapter 1, General Provisions, Article I; each day the violation continues after an abatement notice or initial construction is a separate offense under § 190-135.

Frequently Asked Questions

When is a building permit required in the Village of Ridgewood?
Section 190-97A requires building permits administered under the state Uniform Construction Code, and bars issuance unless plans show the building conforms to Chapter 190 or is legally nonconforming or covered by a valid variance.
Does adding pavement in Ridgewood trigger extra permit steps?
Yes. Section 190-97A(2) requires a site grading and stormwater control plan approved by the Village Engineering Department, Planning Board or Board of Adjustment before a building permit issues for any project adding at least 200 square feet of impervious surface.
Can I get a building permit for property in a flood hazard area?
Only after complying with the flood rules. Section 190-97A(3) bars issuance of a building permit for a structure in a flood hazard area until Chapter 154 and § 190-120 are satisfied, unless it is legally nonconforming or has a valid variance.
What happens if I build in Ridgewood without the required permit?
Section 190-136 makes it a separate misdemeanor for the owner, builder, contractor or anyone assisting, punishable under the penalty set in Chapter 1, Article I, with each day of continued violation counted as a separate offense.

Sources & Official References

Other rules in Ridgewood

All Ridgewood rules

Compare Ridgewood to another location·View the New Jersey building safety overview

Get notified when Building Permits in Ridgewood, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.