Key Facts

Governing section
Building Code § 105.1 (Ch. 7-5, Art. 1)
Permit required for
Construction, alteration, repair, demolition, occupancy change
Application abandoned after
180 days without pursuit
Permit expires
180 days without work start or after stoppage
Unpermitted-work penalty
Investigation fee plus 3x permit fee (§109.2(5))
General Code penalty
Up to $1,000 fine, 6 months jail (§1-12-200)

Summary

San Leandro requires a permit before construction, alteration, repair, demolition, or an occupancy change, and before any regulated electrical, gas, mechanical, or plumbing work, under Building Code Section 105.1 (Chapter 7-5, Article 1). Work done without one is illegal on its own, permits lapse after 180 idle days, and the City charges a triple-fee penalty for unpermitted work.

Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this Code, or to cause any such work to be done, shall first make application to the Building Official and obtain the required permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4967405; v8 updated 2026-07-06).

Full Breakdown

1 of the City Building Code (Chapter 7-5, Article 1) requires any owner or authorized agent to make application to the Building Official and obtain a permit before construction, enlargement, alteration, repair, moving, demolition, or an occupancy change, or before installing, altering, or replacing an electrical, gas, mechanical, or plumbing system regulated by the Code. 3. The Building Official must act within a reasonable time and reject an incomplete application in writing, stating the reasons. An application is deemed abandoned 180 days after filing unless it is being pursued in good faith or a permit has already issued; the Building Official can grant written extensions of up to 180 more days for justifiable cause.

5. 1 separately bars anyone from owning, using, occupying, or maintaining an "Unpermitted Structure," defined as anything built, altered, or converted at any point without the required permits and approvals. 2, including detached tool and storage sheds under 120 square feet, fences under 7 feet in the rear setback, and retaining walls under 4 feet.

Violations & Fines

Building without a permit is not just unpaid paperwork: Section 105.1.1 bars anyone from owning, using, occupying, or maintaining an "Unpermitted Structure," and Section 109.2(5) lets the Building Official investigate before any late permit issues and charge an investigation fee equal to the permit fee, plus a penalty of three times the permit fee before the permit is released. Municipal Code Section 1-12-200 also makes any Code violation a misdemeanor punishable by up to a $1,000 fine and six months in jail, or a lesser infraction.

Frequently Asked Questions

Do I need a permit to build a shed in San Leandro?
Not if it is a detached, one-story tool or storage shed of 120 square feet or less; Section 105.2 exempts it from the building permit requirement. Anything larger, taller, or used as a dwelling still needs a permit, and the shed must still meet the Zoning Code's accessory-structure setbacks.
How long is a San Leandro building permit valid?
An issued permit becomes invalid if work does not start within 180 days, or if it stops for 180 days after starting, under Section 105.5. You can ask the Building Official in writing for one or more 180-day extensions if you show justifiable cause before it lapses.
What happens if I build without a permit in San Leandro?
The Building Official can order a special investigation before issuing a late permit and charge an investigation fee equal to the normal permit fee, plus a penalty of three times the permit fee, under Section 109.2(5). The structure also becomes an "Unpermitted Structure" that Section 105.1.1 bars anyone from occupying or maintaining.

Sources & Official References

Other rules in San Leandro

All San Leandro rules

California rules heatmap·Compare San Leandro to another location·View the California building safety overview

Get notified when Building Permits in San Leandro, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Alameda County handle building permits.

Livermore, CA
Some Restrictions
Fremont, CA
Some Restrictions
Berkeley, CA
Some Restrictions
Oakland, CA
Some Restrictions