Southampton Village, NY Building Safety: Building Permits (2026)
Key Facts
- Issuing official
- Building Inspector, one permit per building or structure
- Exemption
- Ordinary repairs that are not structural in nature
- Decision deadline
- 60 days from submission of the application
- Permit duration
- One year, plus one one-year extension
- Engineer review
- Commercial buildings and residential work costing over $500,000
- Early-start penalty
- Permit fees doubled
Summary
In the Village of Southampton, a separate building permit from the Building Inspector is required before anyone erects, enlarges, alters, improves or converts a building or structure, or changes its occupancy. Only ordinary repairs that are not structural are exempt. The Building Inspector approves or disapproves within 60 days, and a permit lasts one year.
No person, firm or corporation shall commence the erection, enlargement, alteration, improvement, conversion or change in the nature of the occupancy of any building or structure, or cause the same to be done, without first obtaining a separate building permit from the Building Inspector for each such building or structure; except that no building permit shall be required for the performance of ordinary repairs which are not structural in nature. ... No permit to construct any commercial building, any residence in which the cost of construction shall exceed $500,000 or be in connection with the construction or renovation of an existing dwelling at a cost exceeding $500,000 and construction of dwellings in an approved subdivision by a developer shall be issued until the application, plans, specifications and elevations for the dwellings, on-site parking and site improvements shall have been reviewed by the Village Engineer, and a schedule of minimum inspections shall be prepared for such project, and the Building Inspector shall be required to make such inspections during the course of the construction.
Full Breakdown
Section A119-1 of the Building Construction Regulations, promulgated by the Building Inspector and approved by the Board of Trustees on April 14, 1978, sets the trigger. No person, firm or corporation can commence the erection, enlargement, alteration, improvement, conversion or change in the nature of the occupancy of any building or structure without first obtaining a separate building permit from the Building Inspector for each building or structure. The one carve-out is ordinary repairs that are not structural in nature.
The application goes to the Building Inspector on his forms. It must give a description of the land, a statement of the use or occupancy of all parts of the land and the proposed building, the valuation of the work, the owner's and applicant's names and addresses, a brief description of the work, and the applicant's consent to entry by the Building Inspector and Building Department employees without a search warrant. The owner or the owner's authorized agent signs it, and if someone other than the owner applies, an owner affidavit must confirm the work is authorized. Duplicate copies of plans and specifications, including a scale plot plan showing distances from lot lines, are required, though the Building Inspector can waive plans for minor alterations.
Larger projects get a second review. Under § A119-1(G), a permit for a commercial building, or for a residence or renovation costing more than $500,000, waits for review by the Village Engineer and a schedule of minimum inspections.
Timing and cost follow. Section A119-3 gives the Building Inspector 60 days from submission to approve or disapprove, and § A119-4 makes a permit effective for one year, with a maximum of one extension for one additional year on proof of substantial construction above the foundations. Under § A119-2, residential new buildings and additions pay 1.25% of estimated construction cost, not less than $250, up to $100,000, then 1.5% between $100,000 and $1,000,000 and 1.65% above $1,000,000. Tennis courts and other playing courts pay a $2,000 flat fee, and any application requiring a public hearing pays a one-time $450 public hearing fee.
Violations & Fines
Starting work early costs double: § A119-2(C) doubles the building permit fees when construction is commenced before the application is filed. The Building Inspector can revoke a permit for a material false statement, a permit issued in error, work not following the approved application or plans, or failure to comply with a stop order (§ A119-5). Section A119-6 lets the Building Inspector direct the owner or the owner's agent to suspend all work done in violation or in an unsafe and dangerous manner.
Frequently Asked Questions
Do I need a building permit for repairs in the Village of Southampton?
How long does the Building Inspector have to decide?
How long is a building permit valid?
What happens if I start before filing the application?
Sources & Official References
Other rules in Southampton Village
New York rules heatmap·Compare Southampton Village to another location·View the New York building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Suffolk County handle building permits.