Union, NY Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Permit issuer
Code Enforcement Officer, Town of Union
Work must start
Within six months following issuance
Permit expires
12 months after the date of issuance
Plans required
At least two sets of construction documents
New single-family fee
$10 first $2,000 plus $2 per $1,000
Civil penalty
Not more than $200 per day or part thereof

Summary

In the Town of Union outside the Villages of Endicott and Johnson City, a building permit from the Code Enforcement Officer is required for any work that must conform to the New York State Uniform Code or Energy Code, including construction, alteration, removal and demolition. A permit becomes invalid if work does not start within six months and expires 12 months after issuance.

A. Building permits required. Except as otherwise provided in Subsection B of this section, a building permit shall be required for any work which must conform to the Uniform Code and/or the Energy Code, including, but not limited to, the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion thereof, and the installation of a solid-fuel-burning heating appliance, chimney or flue in any dwelling unit. No person shall commence any work for which a building permit is required without first having obtained a building permit from the Code Enforcement Officer. ... I. Time limits. Building permits shall become invalid unless the authorized work is commenced within six months following the date of issuance. Building permits shall expire 12 months after the date of issuance. A building permit which has become invalid or which has expired pursuant to this subsection may be renewed upon application by the permit holder, payment of the applicable fee, and approval of the application by the Code Enforcement Officer.

Full Breakdown

Section 86-4 is the core of Chapter 86, Building Code Administration, adopted December 6, 2006 by Local Law No. 5-2006 to administer the New York State Uniform Fire Prevention and Building Code and the State Energy Conservation Construction Code. Subsection A requires a building permit for any work which must conform to those codes, including the construction, enlargement, alteration, improvement, removal, relocation or demolition of any building or structure or any portion of one, and the installation of a solid-fuel-burning heating appliance, chimney or flue in any dwelling unit. No person can start without first obtaining the permit from the Code Enforcement Officer.

The application is in writing on a form provided by or acceptable to the Code Enforcement Officer and is signed by the owner or an authorized agent. It lists a description of the work, the Tax Map number and street address, the occupancy classification, a statement of special inspections where applicable, and at least two sets of construction documents. Where applicable, the drawings include a site plan showing existing and proposed buildings, any well or septic system, the intended work and the distances between buildings and structures and the lot lines. A New York State registered architect or licensed professional engineer prepares the documents where the Education Law requires. The permit is displayed visibly at the work site until the work is complete, and all work follows the accepted construction documents; the permit holder immediately notifies the Code Enforcement Officer of any change, which can call for an amended permit.

Subsection I sets the clock: a permit becomes invalid unless work starts within six months of issuance and expires 12 months after issuance, and a lapsed permit can be renewed on application, payment of the fee and approval. Subsection B lists exempt work, and Subsection C says an exemption does not authorize work that violates the Uniform Code or Energy Code. Section 86-16 sets fees by resolution of the Council of this Town, for example $10 for the first $2,000 plus $2 per $1,000 for new single-family construction, and a 100% fee increase for failure to obtain a permit before the start of work.

Violations & Fines

Starting work without a required permit exposes the owner to a stop-work order under Section 86-6, and the Section 86-16 schedule lists a 100% fee increase for failing to obtain the permit before work starts. Section 86-15 adds a civil penalty of not more than $200 for each day or part thereof during which a violation continues, plus compliance orders, appearance tickets for Uniform Code violations and court action to enjoin or abate.

Frequently Asked Questions

When is a building permit required in the Town of Union?
Section 86-4(A) requires one for any work which must conform to the Uniform Code or the Energy Code, including construction, enlargement, alteration, improvement, removal, relocation or demolition of a building or structure, and installing a solid-fuel-burning heating appliance, chimney or flue in a dwelling unit. The exemptions in Subsection B are the exception.
How long is a Town of Union building permit valid?
It becomes invalid unless the authorized work starts within six months after the date of issuance, and it expires 12 months after issuance. Under Section 86-4(I), a permit that has become invalid or expired can be renewed on application by the permit holder, payment of the applicable fee, and approval by the Code Enforcement Officer.
What goes into the permit application?
Section 86-4(D) calls for a written application signed by the owner or an authorized agent, with a description of the work, the Tax Map number and street address, the occupancy classification, a statement of special inspections where applicable, and at least two sets of construction documents. Where applicable the documents include a site plan showing distances to the lot lines.
What does a building permit cost in the Town of Union?
Section 86-16 prints a schedule set by resolution of the Council of this Town. New single-family and two-family construction is $10 for the first $2,000 plus $2 per $1,000. Three-or-more-family and commercial/industrial new construction is $25 for the first $2,000 plus $3.50 per $1,000 thereafter. Failure to obtain a permit before work starts brings a 100% increase.

Sources & Official References

Other rules in Union

All Union rules

New York rules heatmap·Compare Union to another location·View the New York building safety overview

Get notified when Building Permits in Union, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.