West Covina, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2022 CBC via L.A. County Title 26
Governing section
WCMC Sec. 7-16
Plan review fee
85% of permit fee
Work-without-permit penalty
Fee doubled
Permit expiration
1 year after last inspection
Violation penalty
Misdemeanor under Sec. 7-24

Summary

West Covina requires a building permit for most construction under Municipal Code Sec. 7-16, which adopts Los Angeles County's Title 26 Building Code, incorporating the 2022 California Building Code, to regulate erection, alteration, repair, moving, conversion, and demolition of buildings and structures citywide.

Except as otherwise provided in this article, Title 26 (Building Code) of the Los Angeles County Code, as amended and in effect on January 1, 2023, adopting the 2022 California Building Code with amendments, together with its appendices, which regulates the erection, construction, enlargement, alteration, repair, moving, removal, conversion, demolition, occupancy, use, equipment, height, area, security, abatement, and maintenance of buildings or structures within the city, provide for the issuance of permits and collection of fees therefor, is hereby adopted by reference as if fully set forth herein, and conflicting ordinances are hereby repealed.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 94).

Full Breakdown

Sec. 7-16(a) adopts Title 26 of the Los Angeles County Code, current as amended and in effect January 1, 2023 and built on the 2022 California Building Code, as West Covina's own Building Code. That adoption reaches the erection, construction, enlargement, alteration, repair, moving, removal, conversion, demolition, occupancy, use, equipment, height, area, security, abatement, and maintenance of buildings or structures citywide, and it is the source of the requirement to obtain a permit and pay fees before that work begins. A complete copy of Title 26 and the 2022 CBC is kept on file at the building official's office under Sec. 7-16(b); where the adopted code conflicts with a locally added amendment, the local amendment controls.

Sec. 7-19 sets the fee mechanics: the building permit fee is based on the total value of the construction, and a separate plan review fee equal to 85 percent of the permit fee is charged when plans are submitted. Anyone who starts work before obtaining the required permit faces a doubled fee under Section 107.1, plus a separate investigation fee under Section 107.3 equal to the permit fee that would otherwise apply. A cancelled, unused permit can be refunded up to 80 percent under Section 107.4, and an uncommenced plan check can be refunded 80 percent under Section 107.5.

Plan check applications expire after 180 days with no permit issued, though the building official can grant up to two 180-day extensions for a fee under Sec. 7-18. Once issued, a permit itself expires one year after the last required inspection or if work has not started within one year of issuance. Violating any provision of this article, including working without a required permit, is a misdemeanor under Sec. 7-24, though the city attorney can instead prosecute it as an infraction, or a code enforcement official can issue an administrative citation under Chapter 15, Article X.

Violations & Fines

Building without a required permit, or work that does not conform to the adopted Building Code, is a misdemeanor under Sec. 7-24, chargeable at the prosecutor's discretion as an infraction, or through an administrative citation under Chapter 15, Article X. Starting work before a permit issues also doubles the permit fee and adds an investigation fee under Sections 107.1 and 107.3.

Frequently Asked Questions

Does West Covina require a permit to build or alter a structure?
Yes. Sec. 7-16(a) adopts Los Angeles County's Title 26 Building Code, built on the 2022 California Building Code, as the city's own code, and that adoption expressly provides for the issuance of permits and collection of fees for erection, alteration, repair, moving, conversion and demolition of buildings.
What happens if I start construction before getting a permit?
Section 107.1, adopted at Sec. 7-19, doubles the required permit fee, and Section 107.3 adds a separate investigation fee equal to what the permit fee would have been, on top of any other penalty the code allows.
How long is a West Covina building permit valid once issued?
One year. Section 106.5.4, adopted at Sec. 7-18, voids a permit automatically one year after the last required inspection was approved, or one year after issuance if no work was ever started.

Sources & Official References

Other rules in West Covina

All West Covina rules

California rules heatmap·Compare West Covina to another location·View the California building safety overview

Get notified when Building Permits in West Covina, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Los Angeles County handle building permits.

Downey, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Pasadena, CA
Some Restrictions