Skip to main content
CityRuleLookup

Kissimmee, FL Building Safety: Childcare Center Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
LDC § 14-6-37
Conditional use trigger
within 300 feet of residential zoning
Drop-off location
must be off the public right-of-way
Multi-tenant sites
drop-off area kept separate from other tenants
Review stage
site plan approval, before building permit

Summary

Kissimmee's Land Development Code sets site-design rules for child care facilities: dedicated pick-up/drop-off areas kept out of the public right-of-way, separated parking, and clear ingress/egress lanes. A facility sited within 300 feet of a residential zoning district needs conditional use approval, not just a permit.

Child care facilities shall meet the following standards:

A.Child care facilities are permitted as shown in tables 4-1 and 4-2. However, where shown as P/C (permitted/conditional), facilities within 300 feet from a residential zoning district require conditional use approval.B.Child care facilities shall provide adequate short-term parking to accommodate pick-up and drop-off areas which are not located in the public right-of-way.C.The location of parking for the child care facility shall be easily identifiable and separated from any parking required for other uses in the surrounding area in order to reduce parking conflicts.E.A pick-up/drop-off area shall be established in close proximity to the entrance of the child care facility to ensure safe ingress and egress into and out of the building.H.For multi-tenant sites, pick-up/drop-off areas shall be separated from other tenant parking to reduce conflicts.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 5).

Full Breakdown

Kissimmee Land Development Code § 14-6-37 governs where and how child care facilities may operate in the city. Permitted use status depends on the zoning district per Tables 4-1 and 4-2 of the LDC, but where the tables mark a district "P/C" (permitted/conditional), any child care facility located within 300 feet of a residential zoning district must go through conditional use approval rather than being approved administratively. Beyond zoning, the section imposes site-design standards aimed at traffic safety around drop-off periods. The facility must provide adequate short-term parking for pick-up and drop-off that does not spill into the public right-of-way, and that parking must be located and marked so it is easily identifiable and kept separate from parking serving other uses on the same site, to cut down on conflicts.

Site plans should include separate lanes for vehicles entering and leaving to keep traffic flowing through the lot. The drop-off area itself must sit close to the facility's entrance so children can be dropped off and picked up safely, and the site must include enough queuing and turnaround space that cars waiting for drop-off do not back up onto a public street. Where a child care facility shares a site with other tenants, its pick-up/drop-off area must be kept separate from the other tenants' parking.

These standards were adopted as part of the 2020 Land Development Code recodification and apply at the site plan review stage, before a building permit issues.

Violations & Fines

These are site plan approval standards, not a fine schedule. The Development Services Department reviews a proposed child care facility's site plan against § 14-6-37 before issuing permits; a plan that lacks a compliant pick-up/drop-off design, mixes its parking with other tenants, or sits within 300 feet of a residential district without conditional use approval will not be approved and cannot move to construction.

Frequently Asked Questions

Can a Kissimmee day care open anywhere zoning allows child care?
Only if it is at least 300 feet from a residential zoning district. Closer than that, in a district table-coded "P/C," the facility needs conditional use approval from the city rather than a routine site plan sign-off, per LDC § 14-6-37.A.
Can parents drop kids off in the street in front of a Kissimmee child care center?
No. LDC § 14-6-37.B requires the facility to provide dedicated short-term parking for pick-up and drop-off that is not located in the public right-of-way, and § 14-6-37.F requires enough on-site queuing space that traffic does not back up onto the road.
Does a child care facility need its own parking separate from other businesses?
Yes, on shared sites. LDC § 14-6-37.C and .H require the facility's parking and pick-up/drop-off area to be easily identifiable and separated from parking serving other tenants or uses to reduce conflicts.

Sources & Official References

Other rules in Kissimmee

All Kissimmee rules

Florida rules heatmap·Compare Kissimmee to another location·View the Florida building safety overview

Get notified when Childcare Center Rules in Kissimmee, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.