Allegany County, MD Building Safety: Electrical Permits (2026)
Key Facts
- Adopted electrical code
- NFPA 70, National Electric Code (§ 255-1D)
- Governing chapter
- Chapter 255, Building Construction
- Effective date
- January 1, 2008, Bill No. 11-07
- Penalty
- $1 to $1,000 per day of violation
- Flood areas
- Wiring below flood elevation needs wet-location rating
Summary
Unincorporated Allegany County requires electrical work to meet NFPA 70, the National Electric Code, which § 255-1D of the Building Construction chapter adopts by reference as part of the county's 2007 Building Code. An electrical permit confirms wiring, panels and fixtures meet that adopted national standard before the county signs off.
The following codes and any subsequent amendments are hereby adopted by reference as the 2007 Building Code of Allegany County, as if the codes were set forth in full in this section, with the additions, insertions, deletions and changes, if any, shown in the Appendix, attached hereto and made a part hereof ... ... D. The National Fire Protection Association Standard No. 70, The National Electric Code.
Full Breakdown
Chapter 255 of the Code of Allegany County, adopted by the Board of County Commissioners on November 8, 2007 under Bill No. 11-07 and effective January 1, 2008, sets out the 2007 Building Code for the unincorporated county. Section 255-1 lists the codes that make up that Building Code, and Subsection D adopts "The National Fire Protection Association Standard No. 70, The National Electric Code" by reference, alongside the 2006 International Building Code, the 2006 International Residential Code, the International Mechanical Code, the Maryland Accessibility Code under COMAR 05.02.02, and NFPA 13D for residential sprinkler systems.
Because NFPA 70 is folded into the county's Building Code rather than published as a separate local ordinance, an electrician or homeowner doing wiring work in unincorporated Allegany County needs a permit under the same Chapter 255 process described in § 360-59: application, plan review, approval, inspection, and a certificate of occupancy before the circuit is put into service. The county's floodplain rules add a related requirement for wiring in flood hazard areas: under § 325-4D(4), electrical systems, equipment and components must sit at or above the elevation required for the lowest floor, and any wiring installed below that elevation has to meet the electrical part of the building code's rules for wet locations.
A violation of any part of the adopted Building Code, including improper or unpermitted electrical work under NFPA 70, is punishable under § 255-2 by a fine of $1 to $1,000, with each day of the violation counted separately.
Violations & Fines
Any violation of the adopted Building Code, including electrical work that skips the required permit or does not meet NFPA 70, the National Electric Code adopted in § 255-1D, is punishable under § 255-2 by a fine of $1 to $1,000. Each day the noncompliant wiring remains in place or in use counts as a separate offense.
Frequently Asked Questions
Does Allegany County have its own electrical code?
Do I need a permit for electrical work in unincorporated Allegany County?
What happens to electrical work that fails inspection?
Sources & Official References
Other rules in Allegany County
Compare Allegany County to another location·View the Maryland building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.