Allegany County, MD Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- Maryland State Plumbing Code, 1984 Ed.
- Permit for new work
- Issued with building permit
- License required
- Master/journey/apprentice plumber
- Inspection
- Before final water/sewer connection
- Homeowner exception
- Own residence, with liability release
Summary
Unincorporated Allegany County requires all plumbing work to follow the Maryland State Plumbing Code, 1984 Edition, adopted as the county's Official Plumbing Code under § 415-2. New construction plumbing is permitted alongside the building permit, and licensed master, journey or apprentice plumbers must do the work under a licensed master plumber's direction.
§ 415-2. Adoption of code by reference; questions of interpretation. A. Adoption. The Allegany County Commissioners hereby adopt the Maryland State Plumbing Code, 1984 Edition, and any subsequent revisions, as the Official Plumbing Code for Allegany County, Maryland. ... ... § 415-3. Licensing; permits; inspections; exceptions. ... B. Permits. ... With the exception of those items listed in Subsection D(2), all plumbing work is subject to the following permit procedure: (1) New construction. New construction shall be permitted in conjunction with a building permit obtained through the local permit system.
Full Breakdown
County Code Chapter 415 adopts the Maryland State Plumbing Code as Allegany County's Official Plumbing Code, under authority granted by Article 25, § 3 of the Annotated Code of Maryland (§ 415-1(B)). Per § 415-2(A), the County Commissioners adopted the 1984 Edition of the state code plus any later revisions, and interpretation questions go to the State Board of Commissioners of Practical Plumbing (§ 415-2(B)). Section 415-3(A) requires all plumbing work in the county to be performed by a licensed master, journey or apprentice plumber under the direction of a master plumber licensed in Maryland, Allegany County or Garrett County, with a narrow exception in Subsection D(1) for homeowners doing their own work up to the final connection, provided they sign a release of liability.
New construction plumbing is permitted through the local building permit system, while repair work needs a permit from whichever jurisdiction issues building permits for that area (§ 415-3(B)). Inspections follow the permit: new work must be inspected before the final tie-in to any public or private water or sewer system, and no final tap may be made operational until the Plumbing Inspector notifies the utility, Sanitary Commission or Health Department in writing that the work is approved (§ 415-3(C)). Minor exceptions exist for federal, county or municipal property, gas-company connections, fixture replacements at the same location, and leak or stoppage repairs excluding drain-trap replacement (§ 415-3(D)(2)).
Enforcement runs through § 415-4: violations by a licensed plumber go to the State Board of Commissioners of Practical Plumbing, while violations by anyone else are referred to the State's Attorney for Allegany County for prosecution as a misdemeanor.
Violations & Fines
Doing plumbing work without the required license or permit, or connecting to water or sewer service before the Plumbing Inspector approves it under § 415-3(C), exposes an unlicensed party to misdemeanor referral to the State's Attorney under § 415-4(B); a licensed plumber's violation is instead referred to the Maryland State Board of Commissioners of Practical Plumbing under § 415-4(A), with penalties set by the state's Master Plumber code.
Frequently Asked Questions
What plumbing code applies in unincorporated Allegany County?
Do I need a permit to do plumbing work?
Can I do my own plumbing at home?
Who inspects plumbing work before hookup?
Sources & Official References
Other rules in Allegany County
Compare Allegany County to another location·View the Maryland building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.