Allegany County, MD Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
Maryland State Plumbing Code, 1984 Ed.
Permit for new work
Issued with building permit
License required
Master/journey/apprentice plumber
Inspection
Before final water/sewer connection
Homeowner exception
Own residence, with liability release

Summary

Unincorporated Allegany County requires all plumbing work to follow the Maryland State Plumbing Code, 1984 Edition, adopted as the county's Official Plumbing Code under § 415-2. New construction plumbing is permitted alongside the building permit, and licensed master, journey or apprentice plumbers must do the work under a licensed master plumber's direction.

These county ordinances apply to unincorporated areas of Allegany County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 415-2. Adoption of code by reference; questions of interpretation. A. Adoption. The Allegany County Commissioners hereby adopt the Maryland State Plumbing Code, 1984 Edition, and any subsequent revisions, as the Official Plumbing Code for Allegany County, Maryland. ... ... § 415-3. Licensing; permits; inspections; exceptions. ... B. Permits. ... With the exception of those items listed in Subsection D(2), all plumbing work is subject to the following permit procedure: (1) New construction. New construction shall be permitted in conjunction with a building permit obtained through the local permit system.

Full Breakdown

County Code Chapter 415 adopts the Maryland State Plumbing Code as Allegany County's Official Plumbing Code, under authority granted by Article 25, § 3 of the Annotated Code of Maryland (§ 415-1(B)). Per § 415-2(A), the County Commissioners adopted the 1984 Edition of the state code plus any later revisions, and interpretation questions go to the State Board of Commissioners of Practical Plumbing (§ 415-2(B)). Section 415-3(A) requires all plumbing work in the county to be performed by a licensed master, journey or apprentice plumber under the direction of a master plumber licensed in Maryland, Allegany County or Garrett County, with a narrow exception in Subsection D(1) for homeowners doing their own work up to the final connection, provided they sign a release of liability.

New construction plumbing is permitted through the local building permit system, while repair work needs a permit from whichever jurisdiction issues building permits for that area (§ 415-3(B)). Inspections follow the permit: new work must be inspected before the final tie-in to any public or private water or sewer system, and no final tap may be made operational until the Plumbing Inspector notifies the utility, Sanitary Commission or Health Department in writing that the work is approved (§ 415-3(C)). Minor exceptions exist for federal, county or municipal property, gas-company connections, fixture replacements at the same location, and leak or stoppage repairs excluding drain-trap replacement (§ 415-3(D)(2)).

Enforcement runs through § 415-4: violations by a licensed plumber go to the State Board of Commissioners of Practical Plumbing, while violations by anyone else are referred to the State's Attorney for Allegany County for prosecution as a misdemeanor.

Violations & Fines

Doing plumbing work without the required license or permit, or connecting to water or sewer service before the Plumbing Inspector approves it under § 415-3(C), exposes an unlicensed party to misdemeanor referral to the State's Attorney under § 415-4(B); a licensed plumber's violation is instead referred to the Maryland State Board of Commissioners of Practical Plumbing under § 415-4(A), with penalties set by the state's Master Plumber code.

Frequently Asked Questions

What plumbing code applies in unincorporated Allegany County?
The Maryland State Plumbing Code, 1984 Edition and later revisions, adopted as the county's Official Plumbing Code under § 415-2(A).
Do I need a permit to do plumbing work?
Yes. New construction plumbing is permitted with the building permit, and repair work needs a permit from the local building-permit jurisdiction, under § 415-3(B).
Can I do my own plumbing at home?
Only on your own residence, up to the final connection to the water or sewer system, and only after signing a release stating the county is not liable, per § 415-3(D)(1).
Who inspects plumbing work before hookup?
The Plumbing Inspector must approve the work in writing before any final tap to a public system or before a private well or septic system is approved, under § 415-3(C).

Sources & Official References

Other rules in Allegany County

All Allegany County rules

Compare Allegany County to another location·View the Maryland building safety overview

Get notified when Plumbing Permits in Allegany County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.