Bend, OR Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
Oregon Electrical Specialty Code
Enforcing office
City of Bend Building Official
Permit expiration
Void after 180 days with no work started
Extension available
Up to 180 more days, written request
Violation class
Class A civil infraction, up to $750
Appeal path
Hearing before independent hearings officer

Summary

In the City of Bend, the Building Official administers the Oregon Electrical Specialty Code for all wiring, service and equipment work. A permit is required before a contractor or homeowner opens walls, adds circuits, or connects power, and utilities cannot be energized until the Building Official signs off.

The City of Bend Building Official is authorized to administer and enforce this chapter and the following State of Oregon Codes for the City of Bend, and shall have all authority granted by these codes, including provisions applicable in Wildfire Hazard Zones, as all areas within Bend City limits are within an established Wildfire Hazard Zone: ... D. ... The Oregon Electrical Specialty Code; ... A violation of this chapter is a Class A civil infraction, unless some other penalty is specified in the applicable specialty code or State law. In the case of a continuing violation, every day's continuance of the violation shall be considered a separate offense. A person cited for a violation of this chapter has the right to a hearing before a hearings officer appointed by the City Manager.

Full Breakdown

10 puts the City of Bend Building Official in charge of enforcing the Oregon Electrical Specialty Code alongside the structural, mechanical, plumbing and residential codes for every property inside city limits, including the wildfire hazard mitigation rules that apply citywide. Because Bend sits entirely within an established Wildfire Hazard Zone, electrical work tied to defensible-space or ignition-resistant construction can trigger extra Building Official review under the adopted Oregon Residential Specialty Code alongside the electrical permit itself. 050 gives the applicant 180 days to start work or the permit becomes null and void, and another 180 days of inaction after work begins is treated as abandonment; a one-time 180-day extension is available on written request if the applicable codes and land-use standards have not changed.

060. 020). 070 guarantees a hearing before a hearings officer appointed by the City Manager, and that officer cannot be a Building Division employee, keeping the adjudication independent of the inspectors who wrote the citation.

Violations & Fines

Unpermitted or noncompliant electrical work is a Class A civil infraction under BC 9.10.070, carrying a civil penalty of up to $750 per BC 1.40.080. Each day the violation continues counts as a separate offense, so an open panel or live splice left uncorrected can rack up daily penalties. The cited party has the right to a hearing before a City-appointed hearings officer who is not part of the Building Division before any penalty becomes final.

Frequently Asked Questions

Does the City of Bend require its own electrical permit?
Yes. The Building Official administers the Oregon Electrical Specialty Code for the City of Bend under BC 9.10.010(D), and a permit is required before wiring, service or equipment work covered by that code can proceed or be connected to utility power.
What happens if my Bend electrical permit expires?
Under BC 9.10.050 the permit becomes null and void if work has not started within 180 days, or if work sits idle for 180 days after starting. You can request a one-time 180-day extension in writing if the codes and land-use standards have not changed since issuance.
Can Bend shut off my power for unpermitted electrical work?
Yes. BC 9.10.015(D) lets the Building Official refuse or disconnect a utility connection to any system regulated by the building code until the required permit is released, and emergency disconnection is allowed where there is an immediate hazard to life or property.
What is the penalty for electrical work without a permit in Bend?
It is a Class A civil infraction under BC 9.10.070, punishable by up to $750 per BC 1.40.080, with each day of continued violation counted separately. You are entitled to a hearing before a hearings officer appointed by the City Manager before the penalty is enforced.

Sources & Official References

Other rules in Bend

All Bend rules

Compare Bend to another location·View the Oregon building safety overview

Get notified when Electrical Permits in Bend, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.