Skip to main content
CityRuleLookup

Bend, OR Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
Oregon Plumbing Specialty Code
Enforcing office
City of Bend Building Official
Permit expiration
180 days from issuance if unstarted
Extension
Up to 180 more days by written request
Reinstatement window
Within one year of expiration
Violation class
Class A civil infraction, up to $750

Summary

The City of Bend Building Official enforces the Oregon Plumbing Specialty Code for all plumbing work in the city. A permit is required before installing or altering water, drain, waste or vent systems, and the permit lapses if work is not started within 180 days.

The City of Bend Building Official is authorized to administer and enforce this chapter and the following State of Oregon Codes for the City of Bend, and shall have all authority granted by these codes, including provisions applicable in Wildfire Hazard Zones, as all areas within Bend City limits are within an established Wildfire Hazard Zone: ... C. ... The Oregon Plumbing Specialty Code; ... A. ... Every permit issued by the Building Official shall expire and become null and void if the building or work authorized by the permit is not commenced within 180 days from the date of the permit, or if the building or work authorized by the permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. The building or work authorized is considered suspended or abandoned if no approved inspections are acquired for 180 days.

Full Breakdown

010 names the Oregon Plumbing Specialty Code as one of the State codes the City of Bend Building Official administers and enforces citywide, alongside the structural, mechanical, electrical and residential codes, and the section notes that all authority granted by those codes applies because every parcel in the city sits within an established Wildfire Hazard Zone. 050 controls its life span: the permit expires and becomes null and void if the authorized work is not commenced within 180 days of issuance, or if it is suspended or abandoned for a 180-day stretch after commencing, and the Building Official treats a 180-day gap with no approved inspections as abandonment.

A permittee holding an unexpired permit may ask in writing for up to 180 additional days if circumstances beyond their control prevented completion, but only if the applicable building codes and land use standards have not changed since issuance and the project is likely to finish in a reasonable time. 050(C) allows reinstatement rather than a fresh application if the same extension conditions are met, no changes have been made to the original plans, and the request comes within one year of expiration; the reinstatement fee is prorated to the review and inspection work actually needed. 040.

Violations & Fines

A violation of the plumbing permitting requirements in BC Chapter 9.10 is a Class A civil infraction under BC 9.10.070, with a civil penalty of up to $750 per BC 1.40.080. Every day the violation continues is treated as a separate offense. Anyone cited has the right to a hearing before a hearings officer appointed by the City Manager, who cannot be a Building Division employee.

Frequently Asked Questions

Who enforces plumbing permits in the City of Bend?
The City of Bend Building Official administers and enforces the Oregon Plumbing Specialty Code under BC 9.10.010(C) for every property within city limits, and issues the permits required before plumbing work begins.
How long is a Bend plumbing permit valid?
Under BC 9.10.050, the permit becomes void if work is not commenced within 180 days of issuance, or if commenced work is suspended or abandoned for 180 days, which includes a 180-day gap with no approved inspections.
Can an expired plumbing permit be reinstated in Bend?
Yes, if the request comes within one year of expiration, the original plans and specifications have not changed, and the same conditions required for an extension are met, per BC 9.10.050(C). The reinstatement fee is prorated to the remaining review and inspection work.
What happens if I do plumbing work in Bend without a permit?
It is a Class A civil infraction under BC 9.10.070, carrying up to a $750 penalty under BC 1.40.080, with each day of continued violation counted separately, though you are entitled to a hearing before an independent hearings officer first.

Sources & Official References

Other rules in Bend

All Bend rules

Compare Bend to another location·View the Oregon building safety overview

Get notified when Plumbing Permits in Bend, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.