Skip to main content
CityRuleLookup

Boston, MA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Enforcing agency
Commissioner of Inspectional Services
Legal basis
M.G.L. c.143 § 3L
Meter loop fee
$10 + $5 per loop
Service fee (>240V)
$0.75 per ampere
Annual maintenance permit
$300/year, logs required
Temporary install (≤180 days)
$25 + $20 per 30 days

Summary

Boston requires the Commissioner of Inspectional Services to approve or disapprove every electrical wiring or fixture installation and repair under M.G.L. Chapter 143, Section 3L. Fees scale with meter loops, service amperage, or outlet count, and contractors can instead buy a $300 annual maintenance permit if they keep detailed logs.

(C) Electrical wiring and fixtures, written notice of approval or disapproval of installation or repair of. The fee of the Commissioner of Inspectional Services for giving under M.G.L. Chapter 143, Section 3L written notice of his or her approval or disapproval of the installation or repair of electrical wiring or fixtures shall be as follows... The fee of the Commissioner of Inspectional Services for receiving an application for a special annual permit to maintain electrical systems shall be $300. Holders of such a maintenance permit shall be required to maintain accurate and up-to-date logs of all work performed, which shall be available for inspection without notice by inspectors during normal business hours.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-2: Current through Ordinance 2025 C. 14, passed 11-5-2025).

Full Breakdown

L. Chapter 143, Section 3L. 25 per ampere at 240 volts or less; work limited to outlets, fixtures, or receptacles costs $20 primary plus $1 per unit installed or replaced, capped at what the service-based formula would produce. 2(BB). Contractors who prefer not to file per-job can instead apply for a special annual permit to maintain electrical systems for $300; holders must keep accurate, up-to-date logs of every job performed and make them available for unannounced inspection during normal business hours. Temporary installations meant to stay in place 180 days or less carry their own schedule: $20 primary plus $50 per 24-hour period for television lighting, or $25 primary plus $20 per 30-day period for everything else.

Violations & Fines

This fee schedule doesn't print a standalone dollar fine; compliance runs through the Commissioner of Inspectional Services' authority to withhold or revoke the written notice of approval required under M.G.L. Chapter 143, Section 3L before work is signed off. Maintenance-permit holders who fail to keep current logs available for unannounced inspection risk losing the $300 annual permit and being pushed back onto the per-job fee schedule.

Frequently Asked Questions

Does Boston require a permit for electrical wiring work?
Yes. The Commissioner of Inspectional Services must give written notice of approval or disapproval of any installation or repair of electrical wiring or fixtures under M.G.L. Chapter 143, Section 3L, and the city charges a fee tied to the meter loop, service size, or outlet count involved.
What is Boston's electrical permit fee based on?
It scales with the work: $10 plus $5 per meter loop, or $20 plus $0.75 per ampere of service rated over 240 volts (or $0.25 per ampere at 240 volts or less), or $20 plus $1 per outlet, fixture, or receptacle for install/replace jobs.
Can an electrician get one annual permit instead of filing per job?
Yes. A special annual permit to maintain electrical systems costs $300, but holders must keep accurate, up-to-date logs of all work performed and make them available for unannounced inspection during normal business hours.
Are temporary electrical installations covered?
Yes. An installation meant to remain 180 days or less carries a primary fee of $25 plus $20 for each 30-day period it stays in place, or, for television lighting specifically, $20 plus $50 per 24-hour period.

Sources & Official References

Other rules in Boston

All Boston rules

Compare Boston to another location·View the Massachusetts building safety overview

Get notified when Electrical Permits in Boston, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in this county handle electrical permits.

Revere, MA
Some Restrictions
Chelsea, MA
Some Restrictions