Skip to main content
CityRuleLookup

Boston, MA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Primary fee
$20 per permit application
Per-fixture fee
$5 per fixture installed/altered/repaired
Issuing authority
Commissioner of Inspectional Services
Underlying permit requirement
780 CMR 105 (state Building Code)
Section
Boston Code of Ordinances § 18-1.16(CC)
Last amended
Ord. 2010 c. 5

Summary

Installing, altering, or repairing plumbing anywhere in Boston requires a permit from the Commissioner of Inspectional Services, and the city charges a primary $20 fee plus $5 per fixture. Boston Code of Ordinances § 18-1.16(CC) sets this fee under the state's Building Code, 780 CMR 105, which requires the underlying permit.

Plumbing installation, alteration or repair permit. The fee of the Commissioner of Inspectional Services for receiving an application for a permit under Section 105 of the commonwealth's Building Code, being 780 CMR 105, to install, alter or repair plumbing in any construction or existing structure shall be a primary fee of $20 plus a fee of $5 for each fixture to be installed, altered or substantially repaired.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-2: Current through Ordinance 2025 C. 14, passed 11-5-2025).

Full Breakdown

" The provision dates to Ord. 1976 c. 11 and was most recently amended by Ord. 2010 c. 5, with intermediate amendments in Ord. 1981 c. 28 and Ord. 1990 c. 5, Ch. 7, § 16. Boston does not write its own technical plumbing code in this chapter: the permit requirement itself flows from 780 CMR 105, the statewide Building Code that Massachusetts requires every municipality to enforce, which displaces any conflicting local plumbing standard. What Boston's own ordinance contributes is narrower but concrete: it names the Commissioner of Inspectional Services as the local official who receives plumbing-permit applications, and it sets the local application fee on a per-fixture sliding scale rather than a flat charge, so a job touching more fixtures costs proportionally more to permit.

A simple single-fixture repair carries a $25 total fee ($20 primary plus $5 for the one fixture), while a larger renovation altering ten fixtures would carry a $70 fee ($20 plus $50). No other Boston ordinance section in this code separately restates plumbing permit procedure; this fee entry is the only local-code text on the subject.

Violations & Fines

Section 18-1.16(CC) sets only the permit fee structure, $20 primary plus $5 per fixture, and names ISD as the receiving office; it does not itself print a penalty for unpermitted plumbing work. Because the underlying permit requirement comes from 780 CMR 105, work performed without the required ISD-issued permit is enforced as a state Building Code compliance matter through Inspectional Services rather than under a separate fine clause in this fee chapter.

Frequently Asked Questions

How much does a plumbing permit cost in Boston?
A primary fee of $20 plus $5 for each fixture being installed, altered, or substantially repaired, per Boston Code of Ordinances § 18-1.16(CC). A one-fixture job costs $25 total; a ten-fixture job costs $70.
Which office issues Boston plumbing permits?
The Commissioner of Inspectional Services receives and processes plumbing permit applications, as named directly in § 18-1.16(CC) of the fee schedule.
What code sets the actual plumbing technical standards in Boston?
780 CMR 105, the Massachusetts statewide Building Code, requires the permit and governs plumbing installation standards. Boston's own ordinance only sets the local application fee; it does not restate separate technical plumbing rules in this chapter.
Is the plumbing permit fee flat or based on job size?
It scales with fixture count: a flat $20 primary fee applies to every application, plus an additional $5 for each fixture to be installed, altered, or substantially repaired, so larger jobs cost proportionally more to permit.

Sources & Official References

Other rules in Boston

All Boston rules

Compare Boston to another location·View the Massachusetts building safety overview

Get notified when Plumbing Permits in Boston, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in this county handle plumbing permits.

Revere, MA
Some Restrictions
Chelsea, MA
Some Restrictions