Boston, MA Building Safety: Plumbing Permits (2026)
Key Facts
- Primary fee
- $20 per permit application
- Per-fixture fee
- $5 per fixture installed/altered/repaired
- Issuing authority
- Commissioner of Inspectional Services
- Underlying permit requirement
- 780 CMR 105 (state Building Code)
- Section
- Boston Code of Ordinances § 18-1.16(CC)
- Last amended
- Ord. 2010 c. 5
Summary
Installing, altering, or repairing plumbing anywhere in Boston requires a permit from the Commissioner of Inspectional Services, and the city charges a primary $20 fee plus $5 per fixture. Boston Code of Ordinances § 18-1.16(CC) sets this fee under the state's Building Code, 780 CMR 105, which requires the underlying permit.
Plumbing installation, alteration or repair permit. The fee of the Commissioner of Inspectional Services for receiving an application for a permit under Section 105 of the commonwealth's Building Code, being 780 CMR 105, to install, alter or repair plumbing in any construction or existing structure shall be a primary fee of $20 plus a fee of $5 for each fixture to be installed, altered or substantially repaired.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-2: Current through Ordinance 2025 C. 14, passed 11-5-2025).
Full Breakdown
" The provision dates to Ord. 1976 c. 11 and was most recently amended by Ord. 2010 c. 5, with intermediate amendments in Ord. 1981 c. 28 and Ord. 1990 c. 5, Ch. 7, § 16. Boston does not write its own technical plumbing code in this chapter: the permit requirement itself flows from 780 CMR 105, the statewide Building Code that Massachusetts requires every municipality to enforce, which displaces any conflicting local plumbing standard. What Boston's own ordinance contributes is narrower but concrete: it names the Commissioner of Inspectional Services as the local official who receives plumbing-permit applications, and it sets the local application fee on a per-fixture sliding scale rather than a flat charge, so a job touching more fixtures costs proportionally more to permit.
A simple single-fixture repair carries a $25 total fee ($20 primary plus $5 for the one fixture), while a larger renovation altering ten fixtures would carry a $70 fee ($20 plus $50). No other Boston ordinance section in this code separately restates plumbing permit procedure; this fee entry is the only local-code text on the subject.
Violations & Fines
Section 18-1.16(CC) sets only the permit fee structure, $20 primary plus $5 per fixture, and names ISD as the receiving office; it does not itself print a penalty for unpermitted plumbing work. Because the underlying permit requirement comes from 780 CMR 105, work performed without the required ISD-issued permit is enforced as a state Building Code compliance matter through Inspectional Services rather than under a separate fine clause in this fee chapter.
Frequently Asked Questions
How much does a plumbing permit cost in Boston?
Which office issues Boston plumbing permits?
What code sets the actual plumbing technical standards in Boston?
Is the plumbing permit fee flat or based on job size?
Sources & Official References
Other rules in Boston
Compare Boston to another location·View the Massachusetts building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Plumbing Permits in Nearby Cities
How other cities in this county handle plumbing permits.